Permit Details

Status:
Complete
Type:
Residential Building - One or Two Family
Apply Date:
05/19/2023
Applicant:
Description:
Lot 35 110' x 1-2' Retaining Wall Lot 36 110' x 1-2' Retaining Wall

Permit Reviews

Permit Number - TC-RES-0523-05307
Permit Status: Complete
Permit Description: Lot 35 110' x 1-2' Retaining Wall Lot 36 110' x 1-2' Retaining Wall
Start Date Submittal Complete Date Status  
05/19/2023 RESIDENTIAL NEW DWELLING v.1 05/19/2023 REQUIRES RESUBMIT Review Details
05/23/2023 RESIDENTIAL NEW DWELLING v.2 06/05/2023 APPROVED Review Details

Conditions

Permit Number - TC-RES-0523-05307
Permit Status: Complete
Permit Description: Lot 35 110' x 1-2' Retaining Wall Lot 36 110' x 1-2' Retaining Wall
Date Description Comments
06/05/2023 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/integrated-planning/PDSD/PDSD_Owner_Builder_Affidavit.pdf, is required prior to issuance of permit.
06/15/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
06/15/2023 Sewer condition must be accepted and released by Pima County

Completed Inspections

Permit Status: Complete
Permit Number: TC-RES-0523-05307
Permit Description: Lot 35 110' x 1-2' Retaining Wall Lot 36 110' x 1-2' Retaining Wall
Total Completed Inspections - 7
Date Description Inspector Results Comments
12/18/2023 COT - RSBU - Masonry Pregrout Passed
12/18/2023 COT - RSBU - Stem Wall/Retaining Wall Passed
12/18/2023 RSBU - Building Final Passed
02/05/2024 COT - RSBU - Excavation/Rebar/Zoning Passed
02/05/2024 RSBU - Building Progress Passed
02/05/2024 ENGR Engineering Final Passed
02/05/2024 SITE - Zoning Final Passed