Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Inspections Complete
Type:
Residential Building - One or Two Family
Apply Date:
05/17/2023
Applicant:
Ladonna Martin
Description:
• SYSTEM SIZE: 9990W DC, 7830W AC • MODULES: (27) MISSION SOLAR ENERGY LLC: TXI6-370120BB • INVERTERS: (27) ENPHASE ENERGY: IQ7PLUS-72-2-US • RACKING: ADJUSTABLE TILE HOOK, SEE DRAWING SNR-DC-00437 CONNECTDER METER COLLAR ADAPTER TO BE USED FOR INTERCONNECTION

Permit Reviews

Permit Number - TC-RES-0523-05246
Permit Status: Inspections complete
Permit Description: • SYSTEM SIZE: 9990W DC, 7830W AC • MODULES: (27) MISSION SOLAR ENERGY LLC: TXI6-370120BB • INVERTERS: (27) ENPHASE ENERGY: IQ7PLUS-72-2-US • RACKING: ADJUSTABLE TILE HOOK, SEE DRAWING SNR-DC-00437 CONNECTDER METER COLLAR ADAPTER TO BE USED FOR INTERCONNECTION
Start Date Submittal Complete Date Status  
05/17/2023 RESIDENTIAL SOLAR v.1 06/12/2023 APPROVED Review Details

Outstanding Inspections

Permit Status: Inspections Complete
Permit Number: TC-RES-0523-05246
Permite Description: • SYSTEM SIZE: 9990W DC, 7830W AC • MODULES: (27) MISSION SOLAR ENERGY LLC: TXI6-370120BB • INVERTERS: (27) ENPHASE ENERGY: IQ7PLUS-72-2-US • RACKING: ADJUSTABLE TILE HOOK, SEE DRAWING SNR-DC-00437 CONNECTDER METER COLLAR ADAPTER TO BE USED FOR INTERCONNECTION
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
09/20/2023 BULD - Electrical Clearance N/A Partial Pass Partial for meter collar, DGL Clearance was called into TEP at 10:50am

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-RES-0523-05246
Permit Description: • SYSTEM SIZE: 9990W DC, 7830W AC • MODULES: (27) MISSION SOLAR ENERGY LLC: TXI6-370120BB • INVERTERS: (27) ENPHASE ENERGY: IQ7PLUS-72-2-US • RACKING: ADJUSTABLE TILE HOOK, SEE DRAWING SNR-DC-00437 CONNECTDER METER COLLAR ADAPTER TO BE USED FOR INTERCONNECTION
Total Completed Inspections - 3
Date Description Inspector Results Comments
10/13/2023 RSBU - Building Final Passed
10/13/2023 COT - RSEL - Electrical Final Passed
10/13/2023 BULD - Electrical Clearance Passed Approved, DGC/DGL Clearance to TEP is required for the solar meter

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
1_FYFFE CONTRACTORS LETTER_V1.PDF DOCUMENTS VIEW
1_FYFFE PLAN SET_V1.PDF DOCUMENTS VIEW
1_FYFFE LOAD CALCS_V1.PDF DOCUMENTS VIEW
1_FYFFE STRUCTURAL LETTER-CALCS_V1.PDF DOCUMENTS VIEW
1_FYFFE SPEC SHEETS_V1.PDF DOCUMENTS VIEW