Permit: TC-RES-0523-05178
Permit Details
Status:
Complete
Type:
Residential Building - One or Two Family
Address:
4988 E SCENIC PEAK WY
Address NEW:
4988 E SCENIC PEAK WY
Apply Date:
05/12/2023
Applicant:
Alex Leon
Description:
Porposed extension addition to existing porch
Permit Reviews
Permit Number - TC-RES-0523-05178
Permit Status: Complete
Permit Description: Porposed extension addition to existing porch
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 10/09/2023 | RESIDENTIAL NEW DWELLING v.2 | 10/10/2023 | APPROVED |
| 05/15/2023 | RESIDENTIAL NEW DWELLING v.1 | 06/15/2023 | REQUIRES RESUBMIT |
| 10/10/2023 | RESTAMP - RESIDENTIAL v.1 | 10/11/2023 | APPROVED |
Conditions
Permit Number - TC-RES-0523-05178
Permit Status: Complete
Permit Description: Porposed extension addition to existing porch
| Date | Description | Comments |
|---|---|---|
| 10/11/2023 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as a contact. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-RES-0523-05178
Permit Description: Porposed extension addition to existing porch
Total Completed Inspections - 7
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/14/2023 | COT - RSBU - Excavation/Rebar/Zoning | Passed | 11/14/23: footings per plan ok to pour and proceed. | |
| 11/17/2023 | COT - RSBU - Roof Nailing | Passed | ||
| 11/17/2023 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | ||
| 11/17/2023 | COT - RSBU - Interior Shear Bracing | Passed | ||
| 11/21/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
| 11/21/2023 | COT - RSEL - Electrical Final | Passed | ||
| 11/21/2023 | RSBU - Building Final | Passed |