Permit: TC-RES-0523-05169
Permit Details
Status:
Complete
Type:
Residential Building - One or Two Family
Address:
2605 E LEE ST
Address NEW:
2605 E LEE ST
Apply Date:
05/12/2023
Applicant:
Ernesto Valdez
Description:
ADU
Permit Reviews
Permit Number - TC-RES-0523-05169
Permit Status: Complete
Permit Description: ADU
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 01/24/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 01/25/2024 | APPROVED |
| 08/22/2023 | RESTAMP - RESIDENTIAL v.1 | 08/22/2023 | APPROVED |
| 05/15/2023 | RESIDENTIAL NEW DWELLING v.1 | 06/15/2023 | REQUIRES RESUBMIT |
| 08/10/2023 | RESIDENTIAL NEW DWELLING v.2 | 08/22/2023 | APPROVED |
Conditions
Permit Number - TC-RES-0523-05169
Permit Status: Complete
Permit Description: ADU
| Date | Description | Comments |
|---|---|---|
| 06/15/2023 | Please contact Pima County Addressing to resolve your addressing issue related to FILL IN THIS SPACE. Addressing@pima.gov or 520-724-9512 | |
| 10/02/2023 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as a contact. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. | |
| 06/15/2023 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-RES-0523-05169
Permit Description: ADU
Total Completed Inspections - 12
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/07/2023 | COT - RSPL - Rough Soil | Passed | ||
| 11/20/2023 | COT - RSBU - Preslab | Passed | 11/20/23: Rebar reinforcement and wire mesh are properly placed for footings and concrete slab. Subsoil is compacted for slab on grade. Okay to pour concrete for footings and slab. | |
| 11/20/2023 | COT - RSBU - Excavation/Rebar/Zoning | Passed | 11/20/23: Rebar reinforcement and wire mesh are properly placed for footings and concrete slab. Subsoil is compacted for slab on grade. Okay to pour concrete for footings and slab. | |
| 11/20/2023 | COT - RSPL - Yard Water Line | Passed | 11/20/23: Water supply line is properly connected to main water supply line. Okay to shade pipe and backfill trench. | |
| 02/02/2024 | COT - RSBU - Roof Nailing | Passed | Roof trusses are properly installed and secured with H2.5 clips. Roof sheathing is properly nailed down. Exterior shear walls are properly installed and nailed per plans. Okay to proceed with exterior stucco work prep. | |
| 02/02/2024 | COT - RSEL - Electrical Underground | Passed | Electrical conduit from main electrical panel on existing residence to ADU panel is complete. Ground wire is connected to ground rod outside of ADU. Okay to shade pipe and backfill trench. | |
| 02/02/2024 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | Roof trusses are properly installed and secured with H2.5 clips. Roof sheathing is properly nailed down. Exterior shear walls are properly installed and nailed per plans. Okay to proceed with exterior stucco work prep. | |
| 04/23/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
| 10/08/2024 | COT - RSPL - Plumbing Final | Passed | ||
| 11/08/2024 | RSBU - Building Final | Passed | ||
| 11/08/2024 | COT - RSEL - Electrical Final | Passed | ||
| 11/08/2024 | COT - RSME - Mechanical Final | Passed |