Permit: TC-RES-0523-05129
Permit Details
Apply Date:
05/11/2023
Applicant:
TFS Solar
Description:
roof mount 3.4 kW DC addition to existing photovoltaic solar system (new total system size: 8.62 kW), 8 additional modules, 1 additional branch circuit, PV subpanel, 40A PV breaker on 200A bus with 200A MCB, NEMA 14-50 outlet 22 modules
Permit Reviews
Permit Number - TC-RES-0523-05129
Permit Status: Inspections complete
Permit Description: roof mount 3.4 kW DC addition to existing photovoltaic solar system (new total system size: 8.62 kW), 8 additional modules, 1 additional branch circuit, PV subpanel, 40A PV breaker on 200A bus with 200A MCB, NEMA 14-50 outlet
22 modules
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
05/16/2023 | RESIDENTIAL SOLAR v.1 | 06/05/2023 | APPROVED |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-RES-0523-05129
Permit Description: roof mount 3.4 kW DC addition to existing photovoltaic solar system (new total system size: 8.62 kW), 8 additional modules, 1 additional branch circuit, PV subpanel, 40A PV breaker on 200A bus with 200A MCB, NEMA 14-50 outlet
22 modules
Total Completed Inspections - 3
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/16/2023 | RSBU - Building Final | Passed | ||
10/16/2023 | COT - RSEL - Electrical Final | Passed | ||
10/16/2023 | BULD - Electrical Clearance | Passed | Approved, DGC clearance to TEP is required for the solar meter / EV charger |