Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Residential Building - One or Two Family
Address:
8250 E ONEIDA PL
Address NEW:
8250 E ONEIDA PL
Apply Date:
05/10/2023
Applicant:
BRANDY PALCHETTI
Description:
• SYSTEM SIZE: 19610W DC, 15370W AC • MODULES: (53) MISSION SOLAR ENERGY LLC: TXI6-370120BB • INVERTERS: (53) ENPHASE ENERGY: IQ7PLUS-72-2-US • RACKING: ULTRA RAIL, SYSTEM DETAIL, FIXED TILT: SNR-DC-00335 • MAIN PANEL REPLACEMENT: EXISTING 200 AMP MAIN PANEL WITH 200 AMP MAIN BREAKER TO BE REPLACED WITH NEW 225 AMP MAIN PANEL WITH 175 AMP MAIN BREAKER. • NEW 100AMP LOAD CENTER TO BE INSTALLED. • SIEMENS MC4040B1200SECW OR EQUIVALENT. • UTILITY: TEP

Permit Reviews

Permit Number - TC-RES-0523-05082
Permit Status: Complete
Permit Description: • SYSTEM SIZE: 19610W DC, 15370W AC • MODULES: (53) MISSION SOLAR ENERGY LLC: TXI6-370120BB • INVERTERS: (53) ENPHASE ENERGY: IQ7PLUS-72-2-US • RACKING: ULTRA RAIL, SYSTEM DETAIL, FIXED TILT: SNR-DC-00335 • MAIN PANEL REPLACEMENT: EXISTING 200 AMP MAIN PANEL WITH 200 AMP MAIN BREAKER TO BE REPLACED WITH NEW 225 AMP MAIN PANEL WITH 175 AMP MAIN BREAKER. • NEW 100AMP LOAD CENTER TO BE INSTALLED. • SIEMENS MC4040B1200SECW OR EQUIVALENT. • UTILITY: TEP
Start Date Submittal Complete Date Status  
05/11/2023 RESIDENTIAL SOLAR v.1 06/02/2023 APPROVED Review Details

Completed Inspections

Permit Status: Complete
Permit Number: TC-RES-0523-05082
Permit Description: • SYSTEM SIZE: 19610W DC, 15370W AC • MODULES: (53) MISSION SOLAR ENERGY LLC: TXI6-370120BB • INVERTERS: (53) ENPHASE ENERGY: IQ7PLUS-72-2-US • RACKING: ULTRA RAIL, SYSTEM DETAIL, FIXED TILT: SNR-DC-00335 • MAIN PANEL REPLACEMENT: EXISTING 200 AMP MAIN PANEL WITH 200 AMP MAIN BREAKER TO BE REPLACED WITH NEW 225 AMP MAIN PANEL WITH 175 AMP MAIN BREAKER. • NEW 100AMP LOAD CENTER TO BE INSTALLED. • SIEMENS MC4040B1200SECW OR EQUIVALENT. • UTILITY: TEP
Total Completed Inspections - 3
Date Description Inspector Results Comments
09/13/2023 COT - RSEL - Electrical Final Passed
09/29/2023 BULD - Electrical Clearance Passed Approved 9/13/23, DGC Clearance to TEP is required for the solar meter
09/29/2023 RSBU - Building Final Passed

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
1_E. LIEBERTHAL LOAD CALCS_V1.PDF DOCUMENTS VIEW
1_E. LIEBERTHAL SPEC SHEETS_V1.PDF DOCUMENTS VIEW
1_E. LIEBERTHAL STRUCTURAL LETTER-CALCS_V1.PDF DOCUMENTS VIEW
1_E. LIEBERTHAL CONTRACTORS LETTER_V1.PDF DOCUMENTS VIEW
1_E. LIEBERTHAL PLAN SET_V1.PDF DOCUMENTS VIEW