Permit: TC-RES-0523-04970
Permit Details
Status:
Complete
Type:
Residential Building - One or Two Family
Address:
1809 S WINMOR AV
Address NEW:
1809 S WINMOR AV
Apply Date:
05/05/2023
Applicant:
Bailey Randall
Description:
Roof mounted PV system 12.4kwdc/8.99kwac 225A MPU 31 modules
Permit Reviews
Permit Number - TC-RES-0523-04970
Permit Status: Complete
Permit Description: Roof mounted PV system
12.4kwdc/8.99kwac
225A MPU
31 modules
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 05/09/2023 | RESIDENTIAL SOLAR v.1 | 05/31/2023 | REQUIRES RESUBMIT |
| 09/19/2023 | RESIDENTIAL SOLAR v.1 | 09/28/2023 | APPROVED |
| 06/05/2023 | RESIDENTIAL SOLAR v.2 | 06/12/2023 | APPROVED |
Conditions
Permit Number - TC-RES-0523-04970
Permit Status: Complete
Permit Description: Roof mounted PV system
12.4kwdc/8.99kwac
225A MPU
31 modules
| Date | Description | Comments |
|---|---|---|
| 09/28/2023 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as a contact. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-RES-0523-04970
Permite Description: Roof mounted PV system
12.4kwdc/8.99kwac
225A MPU
31 modules
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/31/2023 | BULD - Electrical Clearance | N/A | Partial Pass | Partial pass. Okay for cut over on MPU. Okay for TEP INCR. 7/31/2022 |
Completed Inspections
Permit Status: Complete
Permit Number: TC-RES-0523-04970
Permit Description: Roof mounted PV system
12.4kwdc/8.99kwac
225A MPU
31 modules
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/09/2023 | RSBU - Building Final | Passed | ||
| 10/09/2023 | COT - RSEL - Electrical Final | Passed | ||
| 10/09/2023 | BULD - Electrical Clearance | Passed | Approved, DGC clearance to TEP is required for the solar meter |