Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Residential Building - One or Two Family
Address:
3468 S BELMAR AV
Address NEW:
3468 S BELMAR AV
Apply Date:
05/04/2023
Applicant:
Camila Rodriguez
Description:
Installation of solar Pv system (9 Inverters 5 Inverters) - 3.33 KW-DC

Permit Reviews

Permit Number - TC-RES-0523-04934
Permit Status: Complete
Permit Description: Installation of solar Pv system (9 Inverters 5 Inverters) - 3.33 KW-DC
Start Date Submittal Complete Date Status  
05/05/2023 RESIDENTIAL SOLAR v.1 05/22/2023 REQUIRES RESUBMIT Review Details
07/06/2023 RESIDENTIAL SOLAR v.2 10/03/2023 APPROVED Review Details

Conditions

Permit Number - TC-RES-0523-04934
Permit Status: Complete
Permit Description: Installation of solar Pv system (9 Inverters 5 Inverters) - 3.33 KW-DC
Date Description Comments
10/03/2023 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as a contact. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-RES-0523-04934
Permite Description: Installation of solar Pv system (9 Inverters 5 Inverters) - 3.33 KW-DC
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
11/21/2023 COT - RSEL - Electrical Final N/A Canceled

Completed Inspections

Permit Status: Complete
Permit Number: TC-RES-0523-04934
Permit Description: Installation of solar Pv system (9 Inverters 5 Inverters) - 3.33 KW-DC
Total Completed Inspections - 3
Date Description Inspector Results Comments
11/22/2023 RSBU - Building Final Passed
11/22/2023 COT - RSEL - Electrical Final Passed
11/22/2023 BULD - Electrical Clearance Passed DGC

Documents

File Name Document Type  
LOFC_LETTEROFCOMPLETION.PDF DOCUMENTS VIEW
LOFC_LETTEROFCOMPLETION.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-STAMPED PERMIT SET NEW_V1.PDF DOCUMENTS VIEW
PERMIT CANCELLATION REQUEST_ - ALCOVERDE_V1.PDF DOCUMENTS VIEW