Permit: TC-RES-0523-04843
Permit Details
Status:
Complete
Type:
Residential Building - One or Two Family
Address:
7109 E 28TH ST
Address NEW:
7109 E 28TH ST
Apply Date:
05/01/2023
Applicant:
BRANDY PALCHETTI
Description:
• SYSTEM SIZE: 2960W DC, 3840W AC • MODULES: (8) MISSION SOLAR ENERGY LLC: TXI6-370120BB • INVERTERS: (1) DELTA ELECTRONICS: E4-TL-US • RACKING: ULTRA RAIL, SYSTEM DETAIL, OMNIBASE : SNR-DC-01249 • EXISTING SOLAR SYSTEM INSTALLED. • RAPID SHUTDOWN: (8) DELTA ELECTRONICS RSS GP100012103, 1:1 STRING LEVEL RAPID SHUTDOWN DEVICE • MAIN BREAKER DERATE: REPLACE EXISTING 200A MAIN BREAKER WITH NEW 150 AMP MAIN BREAKER.
Permit Reviews
Permit Number - TC-RES-0523-04843
Permit Status: Complete
Permit Description: • SYSTEM SIZE: 2960W DC, 3840W AC
• MODULES: (8) MISSION SOLAR ENERGY LLC: TXI6-370120BB
• INVERTERS: (1) DELTA ELECTRONICS: E4-TL-US
• RACKING: ULTRA RAIL, SYSTEM DETAIL, OMNIBASE :
SNR-DC-01249
• EXISTING SOLAR SYSTEM INSTALLED.
• RAPID SHUTDOWN: (8) DELTA ELECTRONICS RSS
GP100012103, 1:1 STRING LEVEL RAPID SHUTDOWN DEVICE
• MAIN BREAKER DERATE: REPLACE EXISTING 200A MAIN
BREAKER WITH NEW 150 AMP MAIN BREAKER.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 05/04/2023 | RESIDENTIAL SOLAR v.1 | 05/22/2023 | APPROVED |
Completed Inspections
Permit Status: Complete
Permit Number: TC-RES-0523-04843
Permit Description: • SYSTEM SIZE: 2960W DC, 3840W AC
• MODULES: (8) MISSION SOLAR ENERGY LLC: TXI6-370120BB
• INVERTERS: (1) DELTA ELECTRONICS: E4-TL-US
• RACKING: ULTRA RAIL, SYSTEM DETAIL, OMNIBASE :
SNR-DC-01249
• EXISTING SOLAR SYSTEM INSTALLED.
• RAPID SHUTDOWN: (8) DELTA ELECTRONICS RSS
GP100012103, 1:1 STRING LEVEL RAPID SHUTDOWN DEVICE
• MAIN BREAKER DERATE: REPLACE EXISTING 200A MAIN
BREAKER WITH NEW 150 AMP MAIN BREAKER.
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/24/2023 | RSBU - Building Final | Passed | ||
| 08/24/2023 | COT - RSEL - Electrical Final | Passed | ||
| 08/24/2023 | BULD - Electrical Clearance | Passed | Approved, DGC Clearance to TEP is required for the solar meter (150A derate) |