Permit: TC-RES-0426-02281
Permit Details
Status:
Complete
Type:
Residential Building - One or Two Family
Address:
2007 N BELL AV
Address NEW:
2007 N BELL AV
Apply Date:
04/30/2026
Applicant:
TFS Solar
Description:
13.5 kWh battery Storage system. 1 Tesla Powerwall-3 battery circuit with 60A breaker. 200A bus with 200A MCB, interconnection via PCS, Tesla Backup Switch for whole home backup.
Permit Reviews
Permit Number - TC-RES-0426-02281
Permit Status: Complete
Permit Description: 13.5 kWh battery Storage system. 1 Tesla Powerwall-3 battery circuit with 60A breaker.
200A bus with 200A MCB, interconnection via PCS, Tesla Backup Switch for whole home backup.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 04/30/2026 | RESIDENTIAL SIMPLE REVIEW v.1 | 04/30/2026 | APPROVED |
Conditions
Permit Number - TC-RES-0426-02281
Permit Status: Complete
Permit Description: 13.5 kWh battery Storage system. 1 Tesla Powerwall-3 battery circuit with 60A breaker.
200A bus with 200A MCB, interconnection via PCS, Tesla Backup Switch for whole home backup.
| Date | Description | Comments |
|---|---|---|
| 04/30/2026 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit is required prior to issuance of permit. The Affidavit form is available at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Permits/Residential-Permits. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-RES-0426-02281
Permit Description: 13.5 kWh battery Storage system. 1 Tesla Powerwall-3 battery circuit with 60A breaker.
200A bus with 200A MCB, interconnection via PCS, Tesla Backup Switch for whole home backup.
Total Completed Inspections - 2
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/25/2026 | BULD - Electrical Clearance | Passed | Clearance for TEP BAT. 6/25/2026 | |
| 06/25/2026 | COT - RSEL - Electrical Final | Passed |