Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Residential Building - One or Two Family
Address:
5515 S EUCLID AV
Address NEW:
5515 S EUCLID AV
Apply Date:
04/23/2026
Applicant:
Inty Ops
Description:
REV_1, Revised Equipment; Installation of a Tesla Powerwall 3 and Battery Integrated.

Permit Reviews

Permit Number - TC-RES-0426-02101
Permit Status: Complete
Permit Description: REV_1, Revised Equipment; Installation of a Tesla Powerwall 3 and Battery Integrated.
Start Date Submittal Complete Date Status  
04/23/2026 RESIDENTIAL SIMPLE REVIEW v.1 04/23/2026 APPROVED Review Details
08/18/2026 RESIDENTIAL SIMPLE REVIEW REVISION v.1 08/21/2026 REQUIRES RESUBMIT Review Details
08/25/2026 RESIDENTIAL SIMPLE REVIEW REVISION v.2 08/25/2026 APPROVED Review Details
05/08/2026 RESIDENTIAL SIMPLE REVIEW REVISION v.1 05/11/2026 APPROVED Review Details

Conditions

Permit Number - TC-RES-0426-02101
Permit Status: Complete
Permit Description: REV_1, Revised Equipment; Installation of a Tesla Powerwall 3 and Battery Integrated.
Date Description Comments
04/23/2026 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit is required prior to issuance of permit. The Affidavit form is available at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Permits/Residential-Permits. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.

Completed Inspections

Permit Status: Complete
Permit Number: TC-RES-0426-02101
Permit Description: REV_1, Revised Equipment; Installation of a Tesla Powerwall 3 and Battery Integrated.
Total Completed Inspections - 3
Date Description Inspector Results Comments
09/03/2026 BULD - Electrical Clearance Passed Clearance to TEP BAT. 9/3/2026
09/03/2026 COT - RSEL - Electrical Final Passed
09/03/2026 RSEL - Electrical Progress Passed

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD (SSRS).PDF DOCUMENTS VIEW
MARIA CASTANO_RESPOSNSE LETTER-2026-08-24_V2.PDF DOCUMENTS VIEW
MARIA CASTANO_V3_08-21-2026_V2.PDF DOCUMENTS VIEW
MARIA CASTANO_SPECIFICATION AND EQUIPMENT_V1.PDF DOCUMENTS VIEW
MARIA CASTANO_V1_05-06-2026_V1.PDF DOCUMENTS VIEW
RESPONSE LETTER MARIA_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD (SSRS).PDF DOCUMENTS VIEW
MARIA CASTANO_EQUIPMENT AND SPECS_V1.PDF DOCUMENTS VIEW
MARIA CASTANO_V0_04-22-2026_V1.PDF DOCUMENTS VIEW