Permit: TC-RES-0426-01939
Permit Details
Status:
Inspections Complete
Type:
Residential Building - One or Two Family
Address:
7054 E CORTO CARAVACA
Address NEW:
7054 E CORTO CARAVACA
Apply Date:
04/16/2026
Applicant:
Cornelius Thomas
Description:
"Covering panel back up it was removed. No new panel" To repair all electrical violations. To clean up all home,fix all door tha was broken
Permit Reviews
Permit Number - TC-RES-0426-01939
Permit Status: Inspections complete
Permit Description: "Covering panel back up it was removed. No new panel"
To repair all electrical violations.
To clean up all home,fix all door tha was broken
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 04/17/2026 | RESIDENTIAL ADD/ALT v.1 | 04/22/2026 | APPROVED |
Conditions
Permit Number - TC-RES-0426-01939
Permit Status: Inspections complete
Permit Description: "Covering panel back up it was removed. No new panel"
To repair all electrical violations.
To clean up all home,fix all door tha was broken
| Date | Description | Comments |
|---|---|---|
| 04/17/2026 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit is required prior to issuance of permit. The Affidavit form is available at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Permits/Residential-Permits. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-RES-0426-01939
Permit Description: "Covering panel back up it was removed. No new panel"
To repair all electrical violations.
To clean up all home,fix all door tha was broken
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/01/2026 | RSBU - Building Final | Passed | ||
| 04/30/2026 | BULD - Electrical Clearance | Passed | Passed 4/30/26 CLEARANCE RECN | |
| 05/01/2026 | COT - RSEL - Electrical Final | Passed |