Permit: TC-RES-0426-01909
Permit Details
Status:
Inspections Complete
Type:
Residential Building - One or Two Family
Address:
2510 E ADAMS ST
Address NEW:
2510 E ADAMS ST
Apply Date:
04/15/2026
Applicant:
Axel Golden
Description:
New detached garage
Permit Reviews
Permit Number - TC-RES-0426-01909
Permit Status: Inspections complete
Permit Description: New detached garage
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 05/06/2026 | ADMINISTRATIVE v.1 | 05/06/2026 | REQUIRES RESUBMIT |
| 04/17/2026 | RESIDENTIAL ADD/ALT v.1 | 05/01/2026 | REQUIRES RESUBMIT |
| 05/04/2026 | RESIDENTIAL ADD/ALT v.2 | 05/06/2026 | APPROVED |
Conditions
Permit Number - TC-RES-0426-01909
Permit Status: Inspections complete
Permit Description: New detached garage
| Date | Description | Comments |
|---|---|---|
| 04/17/2026 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit is required prior to issuance of permit. The Affidavit form is available at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Permits/Residential-Permits. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. |
Outstanding Inspections
Permit Status: Inspections Complete
Permit Number: TC-RES-0426-01909
Permite Description: New detached garage
Total Outstanding Inspections - 2
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/09/2026 | BULD - Electrical Clearance | N/A | Not Applicable | |
| 09/24/2026 | RSBU - Building Final | N/A | Not Ready |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-RES-0426-01909
Permit Description: New detached garage
Total Completed Inspections - 8
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/22/2026 | COT - RSBU - Excavation/Rebar/Zoning | Passed | 07/22/2026 Approved per plan and reinforcement and setbacks. Okay for concrete placement. Added 5/8" anchor bolts at each side of garage entrance. |
|
| 08/13/2026 | COT - RSBU - Roof Nailing | Passed | ||
| 08/13/2026 | COT - RSEL - Electrical Underground | Passed | 08/13/2026 Verified 1.5" conduit run from SES to new junction box at new garage per TEP. Added schedule 80 above ground. |
|
| 08/13/2026 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 08/13/2026 Added fire foam to top plate penetrations and reinforcement to over-notched stud at sub panel. |
|
| 08/19/2026 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | ||
| 08/24/2026 | COT - RSBU - Interior Shear Bracing | Passed | ||
| 09/29/2026 | COT - RSEL - Electrical Final | Passed | ||
| 09/29/2026 | RSBU - Building Final | Passed |