Permit: TC-RES-0426-01820
Permit Details
Status:
Complete
Type:
Residential Building - One or Two Family
Address:
7409 E KENYON DR
Address NEW:
7409 E KENYON DR
Apply Date:
04/13/2026
Applicant:
James Gibbs
Description:
Main panel upgrade 150a to 200a 1. Remove existing riser, meter & panel 2. Install new riser/weatherhead 3. Install 200a all in one service panel 4. Add grounding 5. Add gas/water bonding
Permit Reviews
Permit Number - TC-RES-0426-01820
Permit Status: Complete
Permit Description: Main panel upgrade 150a to 200a
1. Remove existing riser, meter & panel
2. Install new riser/weatherhead
3. Install 200a all in one service panel
4. Add grounding
5. Add gas/water bonding
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 04/13/2026 | RESIDENTIAL SIMPLE REVIEW v.1 | 04/13/2026 | REQUIRES RESUBMIT |
| 04/14/2026 | RESIDENTIAL SIMPLE REVIEW v.2 | 04/14/2026 | APPROVED |
Conditions
Permit Number - TC-RES-0426-01820
Permit Status: Complete
Permit Description: Main panel upgrade 150a to 200a
1. Remove existing riser, meter & panel
2. Install new riser/weatherhead
3. Install 200a all in one service panel
4. Add grounding
5. Add gas/water bonding
| Date | Description | Comments |
|---|---|---|
| 04/13/2026 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit is required prior to issuance of permit. The Affidavit form is available at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Permits/Residential-Permits. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-RES-0426-01820
Permit Description: Main panel upgrade 150a to 200a
1. Remove existing riser, meter & panel
2. Install new riser/weatherhead
3. Install 200a all in one service panel
4. Add grounding
5. Add gas/water bonding
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/08/2026 | BULD - Electrical Clearance | Passed | 5/8/26 TEP CLEARANCE: INCR, ready for cut over. |
|
| 05/08/2026 | RSEL - Electrical Progress | Passed | ||
| 05/21/2026 | COT - RSEL - Electrical Final | Passed | Passed 5/20/26 |