Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Inspections Complete
Type:
Residential Building - One or Two Family
Address NEW:
1511 N PLAZA DE LIRIOS
Apply Date:
04/08/2026
Applicant:
Barry Ellis
Description:
Ground mount structure for solar panels

Permit Reviews

Permit Number - TC-RES-0426-01751
Permit Status: Inspections complete
Permit Description: Ground mount structure for solar panels
Start Date Submittal Complete Date Status  
04/14/2026 RESIDENTIAL ADD/ALT v.1 05/05/2026 APPROVED Review Details

Conditions

Permit Number - TC-RES-0426-01751
Permit Status: Inspections complete
Permit Description: Ground mount structure for solar panels
Date Description Comments
04/14/2026 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit is required prior to issuance of permit. The Affidavit form is available at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Permits/Residential-Permits. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.

Outstanding Inspections

Permit Status: Inspections Complete
Permit Number: TC-RES-0426-01751
Permite Description: Ground mount structure for solar panels
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
06/03/2026 COT - RSBU - Preslab N/A Not Applicable 06/03/2026
Solar canopy structure verified on different permit.

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-RES-0426-01751
Permit Description: Ground mount structure for solar panels
Total Completed Inspections - 2
Date Description Inspector Results Comments
05/08/2026 COT - RSBU - Excavation/Rebar/Zoning Passed Approved. Total of 8 base footers. Okay for concrete placement. 5/8/2026
06/22/2026 RSBU - Building Final Passed

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD (SSRS).PDF DOCUMENTS VIEW
CONS-SOLAR STRUCTURE_V1.PDF DOCUMENTS VIEW
SITE MAP WITH DIMENSIONS 3_V1.PDF DOCUMENTS VIEW