Permit: TC-RES-0426-01699
Permit Details
Status:
Inspections Complete
Type:
Residential Building - One or Two Family
Address:
843 N ROBB HILL PL
Address NEW:
843 N ROBB HILL PL
Apply Date:
04/06/2026
Applicant:
Michael Sandquist
Description:
Scope of work: Install one dedicated 20amp circuit from existing electrical panel to bathroom for new gfi recep.(using 12/2 romex). Remove existing bathtub and install new walk-in tub. Use existing drain and plumbing.
Permit Reviews
Permit Number - TC-RES-0426-01699
Permit Status: Inspections complete
Permit Description: Scope of work: Install one dedicated 20amp circuit from existing electrical panel to bathroom for new gfi recep.(using 12/2 romex). Remove existing bathtub and install new walk-in tub. Use existing drain and plumbing.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 04/10/2026 | RESIDENTIAL ADD/ALT v.1 | 04/21/2026 | APPROVED |
Conditions
Permit Number - TC-RES-0426-01699
Permit Status: Inspections complete
Permit Description: Scope of work: Install one dedicated 20amp circuit from existing electrical panel to bathroom for new gfi recep.(using 12/2 romex). Remove existing bathtub and install new walk-in tub. Use existing drain and plumbing.
| Date | Description | Comments |
|---|---|---|
| 04/10/2026 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit is required prior to issuance of permit. The Affidavit form is available at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Permits/Residential-Permits. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-RES-0426-01699
Permit Description: Scope of work: Install one dedicated 20amp circuit from existing electrical panel to bathroom for new gfi recep.(using 12/2 romex). Remove existing bathtub and install new walk-in tub. Use existing drain and plumbing.
Total Completed Inspections - 2
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/28/2026 | COT - RSEL - Electrical Final | Passed | Passed 4/28/26 | |
| 04/28/2026 | RSBU - Building Final | Passed | Passed 4/28/26 |