Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Residential Building - One or Two Family
Address:
6941 E 3RD ST
Address NEW:
6941 E 3RD ST
Apply Date:
04/06/2026
Applicant:
TFS Solar
Description:
Roof mount 1.6 kW DC addition to existing photovoltaic solar system (new total system size: 4.23 kW), 4 additional AC modules added to existing branch. Existing 20A pv interconnection on 200A bus with 200A MCB. Add 14-50 EV Charger with 50A breaker.

Permit Reviews

Permit Number - TC-RES-0426-01694
Permit Status: Complete
Permit Description: Roof mount 1.6 kW DC addition to existing photovoltaic solar system (new total system size: 4.23 kW), 4 additional AC modules added to existing branch. Existing 20A pv interconnection on 200A bus with 200A MCB. Add 14-50 EV Charger with 50A breaker.
Start Date Submittal Complete Date Status  
04/06/2026 RESIDENTIAL SOLAR v.1 04/17/2026 APPROVED Review Details

Conditions

Permit Number - TC-RES-0426-01694
Permit Status: Complete
Permit Description: Roof mount 1.6 kW DC addition to existing photovoltaic solar system (new total system size: 4.23 kW), 4 additional AC modules added to existing branch. Existing 20A pv interconnection on 200A bus with 200A MCB. Add 14-50 EV Charger with 50A breaker.
Date Description Comments
04/06/2026 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact.

Completed Inspections

Permit Status: Complete
Permit Number: TC-RES-0426-01694
Permit Description: Roof mount 1.6 kW DC addition to existing photovoltaic solar system (new total system size: 4.23 kW), 4 additional AC modules added to existing branch. Existing 20A pv interconnection on 200A bus with 200A MCB. Add 14-50 EV Charger with 50A breaker.
Total Completed Inspections - 3
Date Description Inspector Results Comments
05/21/2026 BULD - Electrical Clearance Passed 05/21/2026
Clearance TEP DGC. Added 4 panels to existing PV system.
05/21/2026 COT - RSOL - Electrical Final Solar Project Passed 05/21/2026
Added 4 panels to existing PV system.
05/21/2026 RSBU - Building Final Passed 05/21/2026
Clearance TEP DGC. Added 4 panels to existing PV system.

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD (SSRS).PDF DOCUMENTS VIEW
CONS-GEISSLER KATHLEEN PV ADD EVC-DRAWINGS_V1.PDF DOCUMENTS VIEW
GEISSLER KATHLEEN PV ADD EVC-SPECS_V1.PDF DOCUMENTS VIEW