Permit: TC-RES-0426-01694
Permit Details
Status:
Complete
Type:
Residential Building - One or Two Family
Address:
6941 E 3RD ST
Address NEW:
6941 E 3RD ST
Apply Date:
04/06/2026
Applicant:
TFS Solar
Description:
Roof mount 1.6 kW DC addition to existing photovoltaic solar system (new total system size: 4.23 kW), 4 additional AC modules added to existing branch. Existing 20A pv interconnection on 200A bus with 200A MCB. Add 14-50 EV Charger with 50A breaker.
Permit Reviews
Permit Number - TC-RES-0426-01694
Permit Status: Complete
Permit Description: Roof mount 1.6 kW DC addition to existing photovoltaic solar system (new total system size: 4.23 kW), 4 additional AC modules added to existing branch. Existing 20A pv interconnection on 200A bus with 200A MCB.
Add 14-50 EV Charger with 50A breaker.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 04/06/2026 | RESIDENTIAL SOLAR v.1 | 04/17/2026 | APPROVED |
Conditions
Permit Number - TC-RES-0426-01694
Permit Status: Complete
Permit Description: Roof mount 1.6 kW DC addition to existing photovoltaic solar system (new total system size: 4.23 kW), 4 additional AC modules added to existing branch. Existing 20A pv interconnection on 200A bus with 200A MCB.
Add 14-50 EV Charger with 50A breaker.
| Date | Description | Comments |
|---|---|---|
| 04/06/2026 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-RES-0426-01694
Permit Description: Roof mount 1.6 kW DC addition to existing photovoltaic solar system (new total system size: 4.23 kW), 4 additional AC modules added to existing branch. Existing 20A pv interconnection on 200A bus with 200A MCB.
Add 14-50 EV Charger with 50A breaker.
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/21/2026 | BULD - Electrical Clearance | Passed | 05/21/2026 Clearance TEP DGC. Added 4 panels to existing PV system. |
|
| 05/21/2026 | COT - RSOL - Electrical Final Solar Project | Passed | 05/21/2026 Added 4 panels to existing PV system. |
|
| 05/21/2026 | RSBU - Building Final | Passed | 05/21/2026 Clearance TEP DGC. Added 4 panels to existing PV system. |