Permit: TC-RES-0425-02216
Permit Details
Status:
Inspections
Type:
Residential Building - One or Two Family
Address:
1336 E ALLEN RD
Address NEW:
1336 E ALLEN RD
Apply Date:
04/28/2025
Applicant:
Joseph Hart
Description:
100amp Electrical Main Service Upgraded to a 200amp Electrical Main.
Permit Reviews
Permit Number - TC-RES-0425-02216
Permit Status: Inspections
Permit Description: 100amp Electrical Main Service Upgraded to a 200amp Electrical Main.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 04/28/2025 | RESIDENTIAL SIMPLE REVIEW v.1 | 04/28/2025 | APPROVED |
Conditions
Permit Number - TC-RES-0425-02216
Permit Status: Inspections
Permit Description: 100amp Electrical Main Service Upgraded to a 200amp Electrical Main.
| Date | Description | Comments |
|---|---|---|
| 04/28/2025 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit is required prior to issuance of permit. The Affidavit form is available at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Permits/Residential-Permits. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. |
Outstanding Inspections
Permit Status: Inspections
Permit Number: TC-RES-0425-02216
Permite Description: 100amp Electrical Main Service Upgraded to a 200amp Electrical Main.
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/08/2025 | BULD - Electrical Clearance | N/A | Not Ready | 05/08/25 Not ready, panel has not been installed yet. |
Completed Inspections
Permit Status: Inspections
Permit Number: TC-RES-0425-02216
Permit Description: 100amp Electrical Main Service Upgraded to a 200amp Electrical Main.
Total Completed Inspections - 1
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/24/2025 | BULD - Electrical Clearance | Passed | 6/24/25 - Approved 200A service panel upgrades - INCR Clearance to TEP is required for the cutover |