Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Residential Building - One or Two Family
Address NEW:
10601 E CERULEAN WY
Apply Date:
04/22/2025
Applicant:
TFS Solar
Description:
Roof mount 5.22 kW DC photovoltaic solar system; 12 modules; 13.5 kWh Storage, 1 Tesla Powerwall-3 battery with integrated PV inverter with 2 strings. 200A bus with 200A MCB, interconnection via PCS, Tesla Backup Switch for whole home backup.

Permit Reviews

Permit Number - TC-RES-0425-02128
Permit Status: Complete
Permit Description: Roof mount 5.22 kW DC photovoltaic solar system; 12 modules; 13.5 kWh Storage, 1 Tesla Powerwall-3 battery with integrated PV inverter with 2 strings. 200A bus with 200A MCB, interconnection via PCS, Tesla Backup Switch for whole home backup.
Start Date Submittal Complete Date Status  
04/22/2025 RESIDENTIAL SOLAR v.1 05/20/2025 APPROVED Review Details

Completed Inspections

Permit Status: Complete
Permit Number: TC-RES-0425-02128
Permit Description: Roof mount 5.22 kW DC photovoltaic solar system; 12 modules; 13.5 kWh Storage, 1 Tesla Powerwall-3 battery with integrated PV inverter with 2 strings. 200A bus with 200A MCB, interconnection via PCS, Tesla Backup Switch for whole home backup.
Total Completed Inspections - 3
Date Description Inspector Results Comments
06/18/2025 BULD - Electrical Clearance Passed Approved solar with battery - DGC/BAT Clearance to TEP is required for the solar meter
06/18/2025 RSBU - Building Final Passed
06/18/2025 COT - RSOL - Electrical Final Solar Project Passed

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
AUDREY ANN PV 5.22 KW STORAGE 11.5 KWH-SPECS_V1.PDF DOCUMENTS VIEW
CONS-AUDREY ANN PV 5.22 KW STORAGE 11.5 KWH-DRAWINGS_V1.PDF DOCUMENTS VIEW