Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Residential Building - One or Two Family
Address NEW:
380 S SENTINEL PEAK RD
Apply Date:
04/07/2025
Applicant:
TFS Solar
Description:
Roof mount 16.97 kW DC photovoltaic solar system and 25 kWh Storage System. 39 modules with microinverters, 4 branches, 125A PV Combiner Box. (5) Enphase IQ 5P batteries. Batteries and PV combiner box to Enphase Controller 3. Whole home backup to NEW 200A load center with 200A MCB. 200A PCS breaker on 200A bus with 200A MCB. Interconnection via 200A PCS.

Permit Reviews

Permit Number - TC-RES-0425-01808
Permit Status: Complete
Permit Description: Roof mount 16.97 kW DC photovoltaic solar system and 25 kWh Storage System. 39 modules with microinverters, 4 branches, 125A PV Combiner Box. (5) Enphase IQ 5P batteries. Batteries and PV combiner box to Enphase Controller 3. Whole home backup to NEW 200A load center with 200A MCB. 200A PCS breaker on 200A bus with 200A MCB. Interconnection via 200A PCS.
Start Date Submittal Complete Date Status  
04/10/2025 RESIDENTIAL SOLAR v.1 05/12/2025 APPROVED Review Details

Completed Inspections

Permit Status: Complete
Permit Number: TC-RES-0425-01808
Permit Description: Roof mount 16.97 kW DC photovoltaic solar system and 25 kWh Storage System. 39 modules with microinverters, 4 branches, 125A PV Combiner Box. (5) Enphase IQ 5P batteries. Batteries and PV combiner box to Enphase Controller 3. Whole home backup to NEW 200A load center with 200A MCB. 200A PCS breaker on 200A bus with 200A MCB. Interconnection via 200A PCS.
Total Completed Inspections - 4
Date Description Inspector Results Comments
06/30/2025 BULD - Electrical Clearance Passed Approved solar and battery - DGC/BAT Clearance to TEP is required for the solar meter
06/30/2025 COT - RSOL - Grounding/Bonding Solar Project Passed
06/30/2025 COT - RSOL - Electrical Final Solar Project Passed
06/30/2025 RSBU - Building Final Passed

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-TIEMEIER KYLE 16.97KW PV2 25KWH STORAGE-DRAWINGS_V1.PDF DOCUMENTS VIEW
TIEMEIER KYLE 16.97KW PV2 25KWH STORAGE-SPECS_V1.PDF DOCUMENTS VIEW