Permit: TC-RES-0425-01768
Permit Details
Status:
Inspections
Type:
Residential Building - One or Two Family
Address:
5434 E LESTER ST
Address NEW:
5434 E LESTER ST
Apply Date:
04/04/2025
Applicant:
BOE BIGELOW
Description:
INSTALLATION OF 11 ROOFTOP SOLAR PV MODULES (4.455 KW DC) NEW MAIN PANEL UPGRADE 225A, 220A/2P MAIN BREAKER
Permit Reviews
Permit Number - TC-RES-0425-01768
Permit Status: Inspections
Permit Description: INSTALLATION OF 11 ROOFTOP SOLAR PV MODULES (4.455 KW DC)
NEW MAIN PANEL UPGRADE 225A, 220A/2P MAIN BREAKER
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 05/28/2025 | RESIDENTIAL SOLAR v.2 | 06/23/2025 | REQUIRES RESUBMIT |
| 04/07/2025 | RESIDENTIAL SOLAR v.1 | 05/05/2025 | REQUIRES RESUBMIT |
| 06/26/2025 | RESIDENTIAL SOLAR v.3 | 07/29/2025 | APPROVED |
Conditions
Permit Number - TC-RES-0425-01768
Permit Status: Inspections
Permit Description: INSTALLATION OF 11 ROOFTOP SOLAR PV MODULES (4.455 KW DC)
NEW MAIN PANEL UPGRADE 225A, 220A/2P MAIN BREAKER
| Date | Description | Comments |
|---|---|---|
| 07/25/2025 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit is required prior to issuance of permit. The Affidavit form is available at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Permits/Residential-Permits. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. |
Outstanding Inspections
Permit Status: Inspections
Permit Number: TC-RES-0425-01768
Permite Description: INSTALLATION OF 11 ROOFTOP SOLAR PV MODULES (4.455 KW DC)
NEW MAIN PANEL UPGRADE 225A, 220A/2P MAIN BREAKER
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/10/2025 | BULD - Electrical Clearance | N/A | Partial Pass | 10.10.2025 Verbal clearance to TEP INCR at 9:55am for MPU. Partial pending solar. |
Completed Inspections
Permit Status: Inspections
Permit Number: TC-RES-0425-01768
Permit Description: INSTALLATION OF 11 ROOFTOP SOLAR PV MODULES (4.455 KW DC)
NEW MAIN PANEL UPGRADE 225A, 220A/2P MAIN BREAKER
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/14/2025 | BULD - Electrical Clearance | Passed | Passed 10/14/25 Clearance DGC | |
| 10/14/2025 | RSBU - Building Final | Passed | Passed 10/14/25 Clearance DGC | |
| 10/14/2025 | COT - RSOL - Electrical Final Solar Project | Passed | Passed 10/14/25 Clearance DGC |