Permit: TC-RES-0425-01740
Permit Details
Status:
Inspections Complete
Type:
Residential Building - One or Two Family
Address:
868 W MISSOURI ST
Address NEW:
868 W MISSOURI ST
Apply Date:
04/03/2025
Applicant:
Jude Gillum
Description:
Convert Carport into Bedroom and Bathroom
Permit Reviews
Permit Number - TC-RES-0425-01740
Permit Status: Inspections complete
Permit Description: Convert Carport into Bedroom and Bathroom
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 04/09/2025 | RESIDENTIAL NEW DWELLING v.1 | 05/07/2025 | APPROVED |
Conditions
Permit Number - TC-RES-0425-01740
Permit Status: Inspections complete
Permit Description: Convert Carport into Bedroom and Bathroom
| Date | Description | Comments |
|---|---|---|
| 04/09/2025 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit is required prior to issuance of permit. The Affidavit form is available at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Permits/Residential-Permits. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-RES-0425-01740
Permit Description: Convert Carport into Bedroom and Bathroom
Total Completed Inspections - 8
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/09/2025 | COT - RSBU - Excavation/Rebar/Zoning | Passed | 5-9-25, excavation/reinforcement verified per plans. Okay to pour concrete. | |
| 05/09/2025 | COT - RSPL - Rough Soil | Passed | 5-9-25, under ground plumbing verified per plans. Okay to backfill-shading required. | |
| 06/02/2025 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | ||
| 06/02/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
| 07/03/2025 | RSBU - Building Final | Passed | ||
| 07/03/2025 | COT - RSEL - Electrical Final | Passed | ||
| 07/03/2025 | COT - RSME - Mechanical Final | Passed | ||
| 07/03/2025 | COT - RSPL - Plumbing Final | Passed |