Permit: TC-RES-0424-02562
Permit Details
Status:
Inspections Complete
Type:
Residential Building - One or Two Family
Address:
1501 S SAINT TROPAZ PL
Address NEW:
1501 S SAINT TROPAZ PL
Apply Date:
04/29/2024
Applicant:
George Justison
Description:
Inground Pool
Permit Reviews
Permit Number - TC-RES-0424-02562
Permit Status: Inspections complete
Permit Description: Inground Pool
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 05/01/2024 | RESIDENTIAL POOL v.1 | 05/14/2024 | APPROVED |
Conditions
Permit Number - TC-RES-0424-02562
Permit Status: Inspections complete
Permit Description: Inground Pool
| Date | Description | Comments |
|---|---|---|
| 06/11/2024 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-RES-0424-02562
Permit Description: Inground Pool
Total Completed Inspections - 9
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/24/2024 | Pool/Spa - Bonding Grip | Passed | ||
| 07/24/2024 | Pool/Spa - Pre-Gunite | Passed | ||
| 07/24/2024 | Pool/Spa - Plumbing | Passed | okay to backfill. shading required. 7/24/2024 | |
| 10/03/2024 | RSEL - Electrical Progress | Passed | ||
| 10/03/2024 | COT - BULD - SWG Clearance | Passed | Clearance for Southwest Gas. 10/3/2024 | |
| 10/03/2024 | Pool/Spa - Final/Barrier | Passed | ||
| 10/03/2024 | Pool/Spa - Electric | Passed | ||
| 10/09/2024 | COT - RSEL - Electrical Final | Passed | ||
| 10/09/2024 | RSBU - Building Final | Passed |