Permit: TC-RES-0424-02427
Permit Details
Apply Date:
04/23/2024
Applicant:
Ben Ward
Description:
IN GROUND CONRETE POOL
Permit Reviews
Permit Number - TC-RES-0424-02427
Permit Status: Issued
Permit Description: IN GROUND CONRETE POOL
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
04/25/2024 | RESIDENTIAL POOL v.1 | 05/07/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-RES-0424-02427
Permit Status: Issued
Permit Description: IN GROUND CONRETE POOL
Total Outstanding Activity Conditions - 1
Date | Name |
---|---|
04/29/2024 | SFR PERMIT REQUIRED PRIOR TO ISSUANCE |
Outstanding Inspections
Permit Status: Issued
Permit Number: TC-RES-0424-02427
Permite Description: IN GROUND CONRETE POOL
Total Outstanding Inspections - 1
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
06/12/2024 | Pool/Spa - Electric | N/A | Partial Pass | Electrical rough-in for pool lights, pool equipment control panel, and towards main electrical panel is trenched and in place. |
Completed Inspections
Permit Status: Issued
Permit Number: TC-RES-0424-02427
Permit Description: IN GROUND CONRETE POOL
Total Completed Inspections - 9
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
06/12/2024 | Pool/Spa - Bonding Grip | Passed | #4 copper wire is ran completely around pool and connected to the rebar reinforcement in 5 different places and to the pool pump equipment. | |
06/12/2024 | Pool/Spa - Plumbing | Passed | Pool plumbing pipes are in place and holding 25# of pressure. Okay to shade pipes and backfill trenches. | |
06/12/2024 | Pool/Spa - Pre-Gunite | Passed | Pool area is excavated, rebar reinforcement is installed for pool floor and walls. Dobies are holding the rebar from the ground. | |
07/24/2024 | Pool/Spa - Electric | Passed | pool control box is properly installed and wired to main panel. all equipment is installed and properly grounded. okay to proceed. | |
07/24/2024 | COT - RSEL - Electrical Final | Passed | Electrical panel has the correct breaker installed for pool control box and equipment. | |
07/24/2024 | Pool/Spa - Final/Barrier | Passed | Side gate into backyard has a spring loaded closer and is self latching. Garage door, master bedroom door, and sliding glass door from dining room all have alarms installed and are operational. | |
07/24/2024 | RSEL - Electrical Progress | Passed | Electrical panel has the correct breaker installed for pool control box and equipment. | |
07/24/2024 | COT - BULD - SWG Clearance | Passed | Gas pipe to heater has a gas valve installed. Okay to connect to meter. | |
07/24/2024 | RSBU - Building Final | Passed | Pool equipment is installed, gunite is complete, electrical is complete, barrier alarms are installed and operational. Okay to proceed with pebble tech finish. |