Permit: TC-RES-0424-02187
Permit Details
Status:
Complete
Type:
Residential Building - One or Two Family
Address:
2891 W SHERYL DR
Address NEW:
2891 W SHERYL DR
Apply Date:
04/11/2024
Applicant:
Anthony Delgado
Description:
Removing existing Federal Pacific main residential electrical service panel. Upgrading the existing single phase 120v/240v (200) AMP panel to a new "All-in-one" single phase 120v/240/ (200) AMP panel. Installing new 5/8' ground rod and swapping breaker for breaker with NO other upgrades or circuits.
Permit Reviews
Permit Number - TC-RES-0424-02187
Permit Status: Complete
Permit Description: Removing existing Federal Pacific main residential electrical service panel. Upgrading the existing single phase 120v/240v (200) AMP panel to a new "All-in-one" single phase 120v/240/ (200) AMP panel. Installing new 5/8' ground rod and swapping breaker for breaker with NO other upgrades or circuits.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 04/12/2024 | RESIDENTIAL SIMPLE REVIEW v.1 | 04/12/2024 | APPROVED |
Conditions
Permit Number - TC-RES-0424-02187
Permit Status: Complete
Permit Description: Removing existing Federal Pacific main residential electrical service panel. Upgrading the existing single phase 120v/240v (200) AMP panel to a new "All-in-one" single phase 120v/240/ (200) AMP panel. Installing new 5/8' ground rod and swapping breaker for breaker with NO other upgrades or circuits.
| Date | Description | Comments |
|---|---|---|
| 04/15/2024 | The Contractor you have added to your permit cannot be verified. Please contact staff to have the ROC number added to the account. | |
| 04/15/2024 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-RES-0424-02187
Permit Description: Removing existing Federal Pacific main residential electrical service panel. Upgrading the existing single phase 120v/240v (200) AMP panel to a new "All-in-one" single phase 120v/240/ (200) AMP panel. Installing new 5/8' ground rod and swapping breaker for breaker with NO other upgrades or circuits.
Total Completed Inspections - 2
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/10/2024 | BULD - Electrical Clearance | Passed | Approved 200A service panel upgrade, INCR Clearance was called into TEP at 2:25pm | |
| 05/10/2024 | COT - RSEL - Electrical Final | Passed |