Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Residential Building - One or Two Family
Address:
2891 W SHERYL DR
Address NEW:
2891 W SHERYL DR
Apply Date:
04/11/2024
Applicant:
Anthony Delgado
Description:
Removing existing Federal Pacific main residential electrical service panel. Upgrading the existing single phase 120v/240v (200) AMP panel to a new "All-in-one" single phase 120v/240/ (200) AMP panel. Installing new 5/8' ground rod and swapping breaker for breaker with NO other upgrades or circuits.

Permit Reviews

Permit Number - TC-RES-0424-02187
Permit Status: Complete
Permit Description: Removing existing Federal Pacific main residential electrical service panel. Upgrading the existing single phase 120v/240v (200) AMP panel to a new "All-in-one" single phase 120v/240/ (200) AMP panel. Installing new 5/8' ground rod and swapping breaker for breaker with NO other upgrades or circuits.
Start Date Submittal Complete Date Status  
04/12/2024 RESIDENTIAL SIMPLE REVIEW v.1 04/12/2024 APPROVED Review Details

Conditions

Permit Number - TC-RES-0424-02187
Permit Status: Complete
Permit Description: Removing existing Federal Pacific main residential electrical service panel. Upgrading the existing single phase 120v/240v (200) AMP panel to a new "All-in-one" single phase 120v/240/ (200) AMP panel. Installing new 5/8' ground rod and swapping breaker for breaker with NO other upgrades or circuits.
Date Description Comments
04/15/2024 The Contractor you have added to your permit cannot be verified. Please contact staff to have the ROC number added to the account.
04/15/2024 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact.

Completed Inspections

Permit Status: Complete
Permit Number: TC-RES-0424-02187
Permit Description: Removing existing Federal Pacific main residential electrical service panel. Upgrading the existing single phase 120v/240v (200) AMP panel to a new "All-in-one" single phase 120v/240/ (200) AMP panel. Installing new 5/8' ground rod and swapping breaker for breaker with NO other upgrades or circuits.
Total Completed Inspections - 2
Date Description Inspector Results Comments
05/10/2024 BULD - Electrical Clearance Passed Approved 200A service panel upgrade, INCR Clearance was called into TEP at 2:25pm
05/10/2024 COT - RSEL - Electrical Final Passed

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
JOHNSON ELECTRICAL SITE PLANS_V1.PDF DOCUMENTS VIEW