Permit: TC-RES-0424-02122
Permit Details
Status:
Inspections
Type:
Residential Building - One or Two Family
Address:
2421 E CAMERON VISTA
Address NEW:
2421 E CAMERON VISTA
Apply Date:
04/10/2024
Applicant:
Description:
5.40 kW rooftop solar installation on duplex with two separate addresses
Permit Reviews
Permit Number - TC-RES-0424-02122
Permit Status: Inspections
Permit Description: 5.40 kW rooftop solar installation on duplex with two separate addresses
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 07/09/2024 | RESIDENTIAL SOLAR v.2 | 07/16/2024 | REQUIRES RESUBMIT |
| 07/22/2024 | RESIDENTIAL SOLAR v.3 | 07/23/2024 | APPROVED |
| 05/16/2024 | RESIDENTIAL SOLAR v.1 | 05/16/2024 | REQUIRES RESUBMIT |
| 04/15/2024 | RESIDENTIAL SOLAR v.1 | 04/15/2024 | APPROVED |
| 10/14/2024 | RESIDENTIAL SOLAR REVISION v.3 | 10/16/2024 | APPROVED |
| 10/10/2024 | RESIDENTIAL SOLAR REVISION v.2 | 10/10/2024 | IN REVIEW |
| 09/05/2024 | RESIDENTIAL SOLAR REVISION v.1 | 09/19/2024 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TC-RES-0424-02122
Permit Status: Inspections
Permit Description: 5.40 kW rooftop solar installation on duplex with two separate addresses
Total Outstanding Activity Conditions - 2
| Date | Name |
|---|---|
| 04/15/2024 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. |
| 10/16/2024 | The Contractor you have added to your permit cannot be verified. Please contact staff to have the ROC number added to the account. |
Completed Inspections
Permit Status: Inspections
Permit Number: TC-RES-0424-02122
Permit Description: 5.40 kW rooftop solar installation on duplex with two separate addresses
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/24/2024 | BULD - Electrical Clearance | Passed | Approved with an existing line-side tap - DGC/DGL Clearance to TEP is required for the solar meter | |
| 10/24/2024 | RSBU - Building Final | Passed | ||
| 10/24/2024 | COT - RSOL - Electrical Final Solar Project | Passed |