Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Approved
Type:
Residential Building - One or Two Family
Apply Date:
04/10/2024
Applicant:
Solgen Power
Description:
5.40 kW rooftop solar installation on duplex with two separate addresses

Permit Reviews

Permit Number - TC-RES-0424-02122
Permit Status: Approved
Permit Description: 5.40 kW rooftop solar installation on duplex with two separate addresses
Start Date Submittal Complete Date Status  
07/09/2024 RESIDENTIAL SOLAR v.2 07/16/2024 REQUIRES RESUBMIT Review Details
07/22/2024 RESIDENTIAL SOLAR v.3 07/23/2024 APPROVED Review Details
05/16/2024 RESIDENTIAL SOLAR v.1 05/16/2024 REQUIRES RESUBMIT Review Details
04/15/2024 RESIDENTIAL SOLAR v.1 04/15/2024 APPROVED Review Details
10/14/2024 RESIDENTIAL SOLAR REVISION v.3 10/16/2024 APPROVED Review Details
10/10/2024 RESIDENTIAL SOLAR REVISION v.2 10/10/2024 IN REVIEW Review Details
09/05/2024 RESIDENTIAL SOLAR REVISION v.1 09/19/2024 REQUIRES RESUBMIT Review Details

Outstanding Activity Conditions

Permit Number - TC-RES-0424-02122
Permit Status: Approved
Permit Description: 5.40 kW rooftop solar installation on duplex with two separate addresses
Total Outstanding Activity Conditions - 2
Date Name
04/15/2024 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact.
10/16/2024 The Contractor you have added to your permit cannot be verified. Please contact staff to have the ROC number added to the account.

Completed Inspections

Permit Status: Approved
Permit Number: TC-RES-0424-02122
Permit Description: 5.40 kW rooftop solar installation on duplex with two separate addresses
Total Completed Inspections - 3
Date Description Inspector Results Comments
10/24/2024 BULD - Electrical Clearance Passed Approved with an existing line-side tap - DGC/DGL Clearance to TEP is required for the solar meter
10/24/2024 RSBU - Building Final Passed
10/24/2024 COT - RSOL - Electrical Final Solar Project Passed

Documents

File Name Document Type  
CONS-MOLINA UPDATED PLANSET_V2.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-ALMA_MOLINA_(2421)_PV_PLANSET_STMPD_V8_V3.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
ALMA MOLINA - 2421 - STRUCTURAL LETTER (1)_V1.PDF DOCUMENTS VIEW
CONS-MOLINA CAD 2421_V1.PDF DOCUMENTS VIEW