Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Inspections Complete
Type:
Residential Building - One or Two Family
Address:
1315 N 4TH AV
Address NEW:
1315 N 4TH AV
Apply Date:
04/07/2024
Applicant:
Jonathan Torrez
Description:
Arizona Room Addition and Bathroom Extension

Permit Reviews

Permit Number - TC-RES-0424-02043
Permit Status: Inspections complete
Permit Description: Arizona Room Addition and Bathroom Extension
Start Date Submittal Complete Date Status  
09/03/2024 RESIDENTIAL NEW DWELLING v.2 10/01/2024 APPROVED Review Details
04/09/2024 RESIDENTIAL NEW DWELLING v.1 05/09/2024 REQUIRES RESUBMIT Review Details

Conditions

Permit Number - TC-RES-0424-02043
Permit Status: Inspections complete
Permit Description: Arizona Room Addition and Bathroom Extension
Date Description Comments
10/03/2024 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-RES-0424-02043
Permit Description: Arizona Room Addition and Bathroom Extension
Total Completed Inspections - 15
Date Description Inspector Results Comments
04/09/2025 COT - RSBU - Preslab Passed Ok to place concrete in progress area.
04/09/2025 COT - RSBU - Excavation/Rebar/Zoning Passed
05/07/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed Ok to,insulate and cover walls.
05/07/2025 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed Ok to cover exterior walls.
06/05/2025 COT - RSPL - Gas Pressure Test Passed Requested a gas clearance be forwarded to SW Gas.
06/13/2025 COT - BULD - SWG Clearance Passed Ok to set meter and reconnect service.
06/13/2025 COT - RSBU - Roof Nailing Passed
06/13/2025 COT - RSPL - Rough Soil Passed
06/20/2025 COT - RSPL - Yard Water Line Passed 6-20-25: approved.
06/20/2025 COT - RSPL - Plumbing Final Passed 6-20-25: plumbing and building final approved.
06/20/2025 COT - RSME - Mechanical Final Passed 6-20-25: mechanical final approved.
06/20/2025 COT - RSEL - Outdoor Lighting Passed 6-20-25: approved
06/20/2025 COT - RSEL - Electrical Final Passed 6-20-25: electrical final approved.
06/20/2025 RSBU - Building Final Passed 6-20-25: plumbing and building final approved.
06/20/2025 COT - RSPL - Gas Final Passed 6-20-25: approved

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
SD-0624-00055 DECISION NOTICE, STAMPED PLANS.PDF DOCUMENTS VIEW