Permit: TC-RES-0423-04658
Permit Details
Status:
Complete
Type:
Residential Building - One or Two Family
Address:
4633 E 29TH ST
Address NEW:
4633 E 29TH ST
Apply Date:
04/24/2023
Applicant:
Fernando Hinojosa
Description:
Living and Master Suite Addition
Permit Reviews
Permit Number - TC-RES-0423-04658
Permit Status: Complete
Permit Description: Living and Master Suite Addition
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 07/05/2023 | RESTAMP - RESIDENTIAL v.1 | 07/06/2023 | APPROVED |
| 06/15/2023 | RESIDENTIAL NEW DWELLING v.2 | 07/05/2023 | APPROVED |
| 04/28/2023 | RESIDENTIAL NEW DWELLING v.1 | 05/23/2023 | REQUIRES RESUBMIT |
Conditions
Permit Number - TC-RES-0423-04658
Permit Status: Complete
Permit Description: Living and Master Suite Addition
| Date | Description | Comments |
|---|---|---|
| 10/10/2023 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as a contact. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-RES-0423-04658
Permit Description: Living and Master Suite Addition
Total Completed Inspections - 10
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/23/2023 | COT - RSPL - Rough Soil | Passed | 10/23/23: A 10' stack has been added and underground pipes are under a water test. Okay to shade pipes, backfill trenches, and prepare for pre-slab inspection. | |
| 10/27/2023 | COT - RSBU - Preslab | Passed | Corrections were made. 10/27/2023 | |
| 10/27/2023 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
| 11/15/2023 | COT - RSBU - Roof Nailing | Passed | Roof sheathing is properly nailed off to rafters. Rafters have H2.5 clips attached to top plate. Okay to proceed with roofing material. | |
| 11/15/2023 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | Exterior shear walls are properly nailed off. Okay to dry-in exterior walls and prep for stucco finish. | |
| 02/07/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | Mechanical, electrical, and plumbing rough-in is complete. Okay to insulate and drywall walls and ceilings. | |
| 07/09/2024 | COT - RSEL - Electrical Final | Passed | ||
| 07/17/2024 | RSBU - Building Final | Passed | ||
| 07/17/2024 | COT - RSME - Mechanical Final | Passed | ||
| 07/17/2024 | COT - RSPL - Plumbing Final | Passed |