Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Inspections Complete
Type:
Residential Building - One or Two Family
Apply Date:
04/21/2023
Applicant:
Allison Tibbetts
Description:
Installation of new 9.23kW DC/ 10.0KW AC rooftop photovoltaic solar system and upgrading main service panel to new Square D SC42M200PS 26 modules

Permit Reviews

Permit Number - TC-RES-0423-04617
Permit Status: Inspections complete
Permit Description: Installation of new 9.23kW DC/ 10.0KW AC rooftop photovoltaic solar system and upgrading main service panel to new Square D SC42M200PS 26 modules
Start Date Submittal Complete Date Status  
03/21/2024 RESIDENTIAL SOLAR v.1 03/28/2024 APPROVED Review Details
04/25/2023 RESIDENTIAL SOLAR v.1 05/17/2023 APPROVED Review Details
04/29/2024 RESIDENTIAL SOLAR v.1 05/09/2024 APPROVED Review Details

Conditions

Permit Number - TC-RES-0423-04617
Permit Status: Inspections complete
Permit Description: Installation of new 9.23kW DC/ 10.0KW AC rooftop photovoltaic solar system and upgrading main service panel to new Square D SC42M200PS 26 modules
Date Description Comments
03/28/2024 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact.

Outstanding Inspections

Permit Status: Inspections Complete
Permit Number: TC-RES-0423-04617
Permite Description: Installation of new 9.23kW DC/ 10.0KW AC rooftop photovoltaic solar system and upgrading main service panel to new Square D SC42M200PS 26 modules
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
07/10/2023 BULD - Electrical Clearance N/A Canceled 7/10/23: Cancelled per homeowner.

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-RES-0423-04617
Permit Description: Installation of new 9.23kW DC/ 10.0KW AC rooftop photovoltaic solar system and upgrading main service panel to new Square D SC42M200PS 26 modules
Total Completed Inspections - 4
Date Description Inspector Results Comments
10/24/2024 RSBU - Building Final Passed
10/24/2024 BULD - Electrical Clearance Passed Approved - DGC Clearance to TEP is required for the solar meter
10/24/2024 COT - RSEL - Electrical Final Passed
10/24/2024 COT - RSOL - Grounding/Bonding Solar Project Passed

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-FIDEL GUERRA_PLANS 1_04-29-24 LCU_V1.PDF DOCUMENTS VIEW
PE CALCS_FIDEL GUERRA (3)_V1.PDF DOCUMENTS VIEW
RESPONSE LETTER - FIDEL GUERRA 04-29-24_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-FIDEL GUERRA_PLANS_03-21-2024 (1)_V1.PDF DOCUMENTS VIEW
PE CALCS_FIDEL GUERRA (2)_V1.PDF DOCUMENTS VIEW
PE CALCS_FIDEL GUERRA (1)_V1.PDF DOCUMENTS VIEW
LOAD CALCULATION (1) FIDEL GUERRA_V1.PDF DOCUMENTS VIEW
CONS-FIDEL GUERRA_PLANS_040623 - STANDARD (1)_V1.PDF DOCUMENTS VIEW