Permit: TC-RES-0423-04601
Permit Details
Status:
Inspections Complete
Type:
Residential Building - One or Two Family
Address:
10703 E SAGUARO SUNSET PL
Apply Date:
04/20/2023
Applicant:
Nicole Clark
Description:
Installation of a 4.40kW PV system which is an addition to the 1.25kW PV system currently installed on the home: Scope of Work: EARL HAEFLINGER NEW SYSTEM: 4.40 kW DC & 3.19 kW AC OLD SYSTEM: 1.25 kW DC & 3.00 kW AC COMBINED: 5.65 kW DC & 6.19 kW AC AHJ - CITY OF TUCSON (11) HYUNDAI 400W MODULES (1) ENPHASE IQ COMBINER 4 X-IQ-AM1-240-4 (11) ENPHASE MICROINVERTERS IQ8PLUS-72-2-US WITH 1 STRING OF 11 MODULES & 1 (E) STRING OF 5 MODULES ROOF MATERIAL: FLAT CEMENT TILE SNR RAIL FLUSH TO ROOF (E) 200A MAIN SERVICE PANEL (E) 200A MAIN CIRCUIT BREAKER
Permit Reviews
Permit Number - TC-RES-0423-04601
Permit Status: Inspections complete
Permit Description: Installation of a 4.40kW PV system which is an addition to the 1.25kW PV system currently installed on the home:
Scope of Work:
EARL HAEFLINGER NEW SYSTEM: 4.40 kW DC & 3.19 kW AC OLD SYSTEM: 1.25 kW DC & 3.00 kW AC COMBINED: 5.65 kW DC & 6.19 kW AC AHJ - CITY OF TUCSON (11) HYUNDAI 400W MODULES (1) ENPHASE IQ COMBINER 4 X-IQ-AM1-240-4 (11) ENPHASE MICROINVERTERS IQ8PLUS-72-2-US WITH 1 STRING OF 11 MODULES & 1 (E) STRING OF 5 MODULES ROOF MATERIAL: FLAT CEMENT TILE SNR RAIL FLUSH TO ROOF (E) 200A MAIN SERVICE PANEL (E) 200A MAIN CIRCUIT BREAKER
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
04/25/2023 | RESIDENTIAL SOLAR v.1 | 05/17/2023 | APPROVED |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-RES-0423-04601
Permit Description: Installation of a 4.40kW PV system which is an addition to the 1.25kW PV system currently installed on the home:
Scope of Work:
EARL HAEFLINGER NEW SYSTEM: 4.40 kW DC & 3.19 kW AC OLD SYSTEM: 1.25 kW DC & 3.00 kW AC COMBINED: 5.65 kW DC & 6.19 kW AC AHJ - CITY OF TUCSON (11) HYUNDAI 400W MODULES (1) ENPHASE IQ COMBINER 4 X-IQ-AM1-240-4 (11) ENPHASE MICROINVERTERS IQ8PLUS-72-2-US WITH 1 STRING OF 11 MODULES & 1 (E) STRING OF 5 MODULES ROOF MATERIAL: FLAT CEMENT TILE SNR RAIL FLUSH TO ROOF (E) 200A MAIN SERVICE PANEL (E) 200A MAIN CIRCUIT BREAKER
Total Completed Inspections - 3
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
07/05/2023 | BULD - Electrical Clearance | Passed | Approved, DGC Clearance to TEP is required for the solar meter | |
07/05/2023 | RSBU - Building Final | Passed | ||
07/05/2023 | COT - RSEL - Electrical Final | Passed |