Permit: TC-RES-0423-04382
Permit Details
Status:
Complete
Type:
Residential Building - One or Two Family
Address:
750 W HOLLADAY DR
Address NEW:
750 W HOLLADAY DR
Apply Date:
04/13/2023
Applicant:
Bailey Randall
Description:
Roof mounted PV system 3.2kwdc//3kwac 200A MPU 8 modules
Permit Reviews
Permit Number - TC-RES-0423-04382
Permit Status: Complete
Permit Description: Roof mounted PV system
3.2kwdc//3kwac
200A MPU
8 modules
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 04/17/2023 | RESIDENTIAL SOLAR v.1 | 05/08/2023 | APPROVED |
| 12/04/2023 | RESIDENTIAL SOLAR v.1 | 12/13/2023 | APPROVED |
Conditions
Permit Number - TC-RES-0423-04382
Permit Status: Complete
Permit Description: Roof mounted PV system
3.2kwdc//3kwac
200A MPU
8 modules
| Date | Description | Comments |
|---|---|---|
| 12/13/2023 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as a contact. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-RES-0423-04382
Permite Description: Roof mounted PV system
3.2kwdc//3kwac
200A MPU
8 modules
Total Outstanding Inspections - 4
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/08/2023 | BULD - Electrical Clearance | N/A | Partial Pass | INCR |
| 11/14/2023 | RSBU - Building Final | N/A | Re-inspection required | 11/14/23 Plans not matching work, added second disconnect not on plans required revised plan |
| 11/20/2023 | COT - RSOL - Electrical Final Solar Project | N/A | Canceled | no response |
| 11/14/2023 | COT - RSOL - Grounding/Bonding Solar Project | N/A | Re-inspection required | 11/14/23 Plans not matching work, added second disconnect not on plans required revised plan |
Completed Inspections
Permit Status: Complete
Permit Number: TC-RES-0423-04382
Permit Description: Roof mounted PV system
3.2kwdc//3kwac
200A MPU
8 modules
Total Completed Inspections - 4
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/09/2024 | BULD - Electrical Clearance | Passed | Approved, DGC Clearance to TEP is required for the solar meter | |
| 01/09/2024 | RSBU - Building Final | Passed | ||
| 01/09/2024 | COT - RSOL - Electrical Final Solar Project | Passed | ||
| 01/09/2024 | COT - RSOL - Grounding/Bonding Solar Project | Passed |