Permit: TC-RES-0423-04371
Permit Details
Status:
Issued
Type:
Residential Building - One or Two Family
Address:
4210 E HAWTHORNE ST
Address NEW:
4210 E HAWTHORNE ST
Apply Date:
04/13/2023
Applicant:
Danny Foster
Description:
EMERGENCY GAS LINE REPLACEMENT- HOME IS OCCUPIED The bid price is to include installing a new 1”-½" gas line from the existing gas meter to feed the following existing fixtures roughly 70’: 1-Tank type water heater (34,000 btu) 1-Standard dryer (Roughly 20,000 btu) 1-Standard 4 burner stove/oven (Roughly 12,000 btu) 1-Gas Pack located on the roof (80,000 btu) The bid price includes running the new lines in black iron material in the easiest shortest route possible while still allowing the proper size gas line to feed all the existing fixtures. The bid includes using any piping onsite that is still good and holding an air pressure test, if any of the existing piping doesn’t hold the bid includes installing new black iron piping. The bid pricing includes supporting the black iron piping with foam Unistrut blocks to keep off of the roof as per code. The bid price includes putting the new line under an air test at 15psi for city inspection. The bid includes providing a city required drawing with permit. Once the lines have passed inspection the customer is to call SWG to reconnect the meter and turn on the existing appliances. The bid does not include any other plumbing, private utilities, appliance functionality, or anything else not listed above.
Permit Reviews
Permit Number - TC-RES-0423-04371
Permit Status: Issued
Permit Description: EMERGENCY GAS LINE REPLACEMENT- HOME IS OCCUPIED
The bid price is to include installing a new 1”-½" gas line from the existing gas meter to feed the following existing fixtures roughly 70’: 1-Tank type water heater (34,000 btu) 1-Standard dryer (Roughly 20,000 btu) 1-Standard 4 burner stove/oven (Roughly 12,000 btu) 1-Gas Pack located on the roof (80,000 btu) The bid price includes running the new lines in black iron material in the easiest shortest route possible while still allowing the proper size gas line to feed all the existing fixtures. The bid includes using any piping onsite that is still good and holding an air pressure test, if any of the existing piping doesn’t hold the bid includes installing new black iron piping. The bid pricing includes supporting the black iron piping with foam Unistrut blocks to keep off of the roof as per code. The bid price includes putting the new line under an air test at 15psi for city inspection. The bid includes providing a city required drawing with permit. Once the lines have passed inspection the customer is to call SWG to reconnect the meter and turn on the existing appliances. The bid does not include any other plumbing, private utilities, appliance functionality, or anything else not listed above.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 04/13/2023 | COMMERCIAL PDSD SIMPLE REVIEW v.1 | 04/13/2023 | APPROVED |
Completed Inspections
Permit Status: Issued
Permit Number: TC-RES-0423-04371
Permit Description: EMERGENCY GAS LINE REPLACEMENT- HOME IS OCCUPIED
The bid price is to include installing a new 1”-½" gas line from the existing gas meter to feed the following existing fixtures roughly 70’: 1-Tank type water heater (34,000 btu) 1-Standard dryer (Roughly 20,000 btu) 1-Standard 4 burner stove/oven (Roughly 12,000 btu) 1-Gas Pack located on the roof (80,000 btu) The bid price includes running the new lines in black iron material in the easiest shortest route possible while still allowing the proper size gas line to feed all the existing fixtures. The bid includes using any piping onsite that is still good and holding an air pressure test, if any of the existing piping doesn’t hold the bid includes installing new black iron piping. The bid pricing includes supporting the black iron piping with foam Unistrut blocks to keep off of the roof as per code. The bid price includes putting the new line under an air test at 15psi for city inspection. The bid includes providing a city required drawing with permit. Once the lines have passed inspection the customer is to call SWG to reconnect the meter and turn on the existing appliances. The bid does not include any other plumbing, private utilities, appliance functionality, or anything else not listed above.
Total Completed Inspections - 2
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/17/2023 | COT - RSPL - Plumbing Final | Passed | ||
| 04/17/2023 | COT - BULD - SWG Clearance | Passed | Approved, SWG Clearance is required for the reconnection |