Permit: TC-RES-0423-04312
Permit Details
Status:
Complete
Type:
Residential Building - One or Two Family
Address:
1751 W CALLE TRANQUILA
Address NEW:
1751 W CALLE TRANQUILA
Apply Date:
04/12/2023
Applicant:
BRANDY PALCHETTI
Description:
• SYSTEM SIZE: 12580W DC, 9860W AC • MODULES: (34) MISSION SOLAR ENERGY LLC: TXI6-370120BB • INVERTERS: (34) ENPHASE ENERGY: IQ7PLUS-72-2-US • RACKING: ULTRA RAIL, ATTACHMENT DETAIL, OMNIBASE WITH STANDOFF TO RAFTER: SNR-DC-01249 • MAIN PANEL REPLACEMENT: EXISTING 200 AMP MAIN PANEL WITH 200 AMP MAIN BREAKER TO BE REPLACED WITH NEW 225 AMP MAIN PANEL WITH 200 AMP MAIN BREAKER. • SIEMENS MC4040B1200SECW OR EQUIVALENT
Permit Reviews
Permit Number - TC-RES-0423-04312
Permit Status: Complete
Permit Description: • SYSTEM SIZE: 12580W DC, 9860W AC
• MODULES: (34) MISSION SOLAR ENERGY LLC:
TXI6-370120BB
• INVERTERS: (34) ENPHASE ENERGY: IQ7PLUS-72-2-US
• RACKING: ULTRA RAIL, ATTACHMENT DETAIL, OMNIBASE
WITH STANDOFF TO RAFTER: SNR-DC-01249
• MAIN PANEL REPLACEMENT: EXISTING 200 AMP MAIN
PANEL WITH 200 AMP MAIN BREAKER TO BE REPLACED
WITH NEW 225 AMP MAIN PANEL WITH 200 AMP MAIN
BREAKER.
• SIEMENS MC4040B1200SECW OR EQUIVALENT
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 04/12/2023 | RESIDENTIAL SOLAR v.1 | 05/05/2023 | REQUIRES RESUBMIT |
| 08/08/2023 | RESIDENTIAL SOLAR v.1 | 08/11/2023 | APPROVED |
| 05/31/2023 | RESIDENTIAL SOLAR v.2 | 06/13/2023 | APPROVED |
Completed Inspections
Permit Status: Complete
Permit Number: TC-RES-0423-04312
Permit Description: • SYSTEM SIZE: 12580W DC, 9860W AC
• MODULES: (34) MISSION SOLAR ENERGY LLC:
TXI6-370120BB
• INVERTERS: (34) ENPHASE ENERGY: IQ7PLUS-72-2-US
• RACKING: ULTRA RAIL, ATTACHMENT DETAIL, OMNIBASE
WITH STANDOFF TO RAFTER: SNR-DC-01249
• MAIN PANEL REPLACEMENT: EXISTING 200 AMP MAIN
PANEL WITH 200 AMP MAIN BREAKER TO BE REPLACED
WITH NEW 225 AMP MAIN PANEL WITH 200 AMP MAIN
BREAKER.
• SIEMENS MC4040B1200SECW OR EQUIVALENT
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/04/2023 | BULD - Electrical Clearance | Passed | ||
| 10/16/2023 | COT - RSEL - Electrical Final | Passed | ||
| 10/19/2023 | RSBU - Building Final | Passed |