Permit: TC-RES-0423-04310
Permit Details
Status:
Issued
Type:
Residential Building - One or Two Family
Address:
2833 E 5TH ST
Address NEW:
2833 E 5TH ST
Apply Date:
04/11/2023
Applicant:
Michael Aragon
Description:
Replacing old sewer line and tying in to excisting city H.C.S.
Permit Reviews
Permit Number - TC-RES-0423-04310
Permit Status: Issued
Permit Description: Replacing old sewer line and tying in to excisting city H.C.S.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 04/12/2023 | COMMERCIAL PDSD SIMPLE REVIEW v.1 | 04/18/2023 | REQUIRES RESUBMIT |
| 04/27/2023 | COMMERCIAL PDSD SIMPLE REVIEW v.2 | 04/28/2023 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-RES-0423-04310
Permit Status: Issued
Permit Description: Replacing old sewer line and tying in to excisting city H.C.S.
Total Outstanding Activity Conditions - 2
| Date | Name |
|---|---|
| 04/28/2023 | Provide Finished Floor Elevations for two Residences: Backwater valve protection: https://www.tucsonaz.gov/files/integrated-planning/pdsd/2018_-_IRC_Amendments.PDF Section P3008.1 Where required. Where the finish floor elevation is less than 12 inches above the elevation of the next upstream manhole cover in the sewer, a backwater valve shall be installed in the building drain or branch of the building drain serving that floor. Floors discharging from above that reference point shall not discharge through the same back water valve. Provide BWV protection or prove it is not required. |
| 04/28/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. |
Completed Inspections
Permit Status: Issued
Permit Number: TC-RES-0423-04310
Permit Description: Replacing old sewer line and tying in to excisting city H.C.S.
Total Completed Inspections - 5
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/17/2023 | COT - RSPL - Sewer | Passed | Sewer line is complete | |
| 05/17/2023 | COT - RSPL - Rough Soil | Passed | ||
| 05/17/2023 | RSBU - Building Final | Passed | ||
| 05/17/2023 | COT - RSPL - Plumbing Final | Passed | Sewer line is complete | |
| 05/17/2023 | RSPL - Plumbing Progress | Passed |