Permit: TC-RES-0423-04144
Permit Details
Apply Date:
04/05/2023
Applicant:
Cheyenne Palmer
Description:
SFR
Permit Reviews
Permit Number - TC-RES-0423-04144
Permit Status: Complete
Permit Description: SFR
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
01/17/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.2 | 01/19/2024 | REQUIRES RESUBMIT |
09/20/2024 | RESIDENTIAL NEW DWELLING v.1 | 09/25/2024 | APPROVED |
01/02/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 01/02/2024 | REQUIRES RESUBMIT |
02/01/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.3 | 02/02/2024 | REQUIRES RESUBMIT |
05/25/2023 | RESIDENTIAL NEW DWELLING v.2 | 06/22/2023 | APPROVED |
02/07/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.4 | 02/09/2024 | APPROVED |
04/06/2023 | RESIDENTIAL NEW DWELLING v.1 | 05/04/2023 | REQUIRES RESUBMIT |
Conditions
Permit Number - TC-RES-0423-04144
Permit Status: Complete
Permit Description: SFR
Date | Description | Comments |
---|---|---|
06/22/2023 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/integrated-planning/PDSD/PDSD_Owner_Builder_Affidavit.pdf, is required prior to issuance of permit. | |
06/14/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. | |
06/22/2023 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-RES-0423-04144
Permite Description: SFR
Total Outstanding Inspections - 1
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
12/19/2023 | COT - RSPL - Rough Soil | N/A | Partial Pass | Partial pass for under slab only HCS is not connected for prints |
Completed Inspections
Permit Status: Complete
Permit Number: TC-RES-0423-04144
Permit Description: SFR
Total Completed Inspections - 16
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
01/05/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
01/05/2024 | COT - RSBU - Preslab | Passed | ||
02/14/2024 | BULD - Electrical Clearance | Passed | Electrical panel is properly installed to exterior wall, with felt paper behind as a vapor barrier, riser is secured to exterior wall with weather head and wiring installed. 2 separate ground rods are installed and grounding wire is properly installed. ECO Clearance issued for TEP to energize panel. | |
02/14/2024 | COT - RSEL - Grounding/Bonding | Passed | Ground rods are pounded into the ground at 2 separate locations. | |
03/06/2024 | COT - RSPL - Rough Soil | Passed | Passed underground plumbing. Sewer inspection has been created. Contractor is working with subcontractor to schedule installation of sewer line from houses to Warren Avenue down the alleyway. | |
06/11/2024 | COT - RSPL - Sewer | Passed | ||
06/12/2024 | COT - RSPL - Yard Water Line | Passed | ||
07/25/2024 | COT - RSBU - Exterior Clips/Sheathing | Passed | ||
07/25/2024 | COT - RSBU - Interior Shear Bracing | Passed | ||
07/25/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | This inspection is to include Building Final (passed). | |
07/25/2024 | COT - RSBU - Roof Nailing | Passed | ||
07/26/2024 | COT - RSEL - Electrical Final | Passed | ||
07/26/2024 | COT - RSME - Mechanical Final | Passed | ||
07/26/2024 | RSBU - Building Final | Passed | ||
07/26/2024 | COT - RSPL - Plumbing Final | Passed | ||
09/26/2024 | COT - RSEL - Electrical Underground | Passed |