Permit: TC-RES-0423-04039
Permit Details
Apply Date:
04/01/2023
Applicant:
Selina Rojas
Description:
SFR Remodel and Additions
Permit Reviews
Permit Number - TC-RES-0423-04039
Permit Status: Issued
Permit Description: SFR Remodel and Additions
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
06/26/2023 | RESIDENTIAL NEW DWELLING v.3 | 06/26/2023 | APPROVED |
12/07/2023 | RESIDENTIAL NEW DWELLING v.2 | 12/08/2023 | APPROVED |
10/17/2023 | RESIDENTIAL NEW DWELLING v.1 | 11/01/2023 | REQUIRES RESUBMIT |
04/03/2023 | RESIDENTIAL NEW DWELLING v.1 | 05/04/2023 | REQUIRES RESUBMIT |
12/08/2023 | RESTAMP - RESIDENTIAL v.1 | 12/08/2023 | APPROVED |
05/17/2023 | RESIDENTIAL NEW DWELLING v.2 | 06/08/2023 | REQUIRES RESUBMIT |
06/26/2023 | RESTAMP - RESIDENTIAL v.1 | 06/27/2023 | REQUIRES RESUBMIT |
07/25/2023 | RESTAMP - RESIDENTIAL v.2 | 07/25/2023 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-RES-0423-04039
Permit Status: Issued
Permit Description: SFR Remodel and Additions
Total Outstanding Activity Conditions - 1
Date | Name |
---|---|
04/24/2023 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Issued
Permit Number: TC-RES-0423-04039
Permite Description: SFR Remodel and Additions
Total Outstanding Inspections - 1
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
02/08/2024 | COT - RSPL - Rough Soil | N/A | Partial Pass | Inside. |
Completed Inspections
Permit Status: Issued
Permit Number: TC-RES-0423-04039
Permit Description: SFR Remodel and Additions
Total Completed Inspections - 10
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
01/26/2024 | COT - RSEL - Grounding/Bonding | Passed | ||
01/26/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
02/26/2024 | COT - RSBU - Preslab | Passed | Footing is properly dug, rebar reinforcement is in place per plans, wire mesh is installed for concrete slab, plumbing pipes are properly wrapped to protect from concrete damage, and forms are set. Okay to pour concrete. | |
02/26/2024 | COT - RSBU - Stem Wall/Retaining Wall | Passed | CMU block is properly installed for stem walls with rebar reinforcement in place. Okay to solid grout stem walls. | |
02/26/2024 | COT - RSEL - Electrical Underground | Passed | Electrical conduit is installed in trench from transformer to panel on side of house. Okay to backfill trench. | |
02/26/2024 | BULD - Electrical Clearance | Passed | TEP has inspected underground electrical system from transformer to power panel and passed it. Electrical panel is energized and GFCI construction receptacle is working properly. | |
02/26/2024 | COT - RSPL - Rough Soil | Passed | Underground plumbing on north side is complete and under water test. Okay to shade pipes and backfill. | |
03/21/2024 | COT - RSBU - Masonry Pregrout | Passed | ||
06/27/2024 | COT - RSBU - Roof Nailing | Passed | ||
10/04/2024 | COT - RSBU - Exterior Clips/Sheathing | Passed | 10/4/24: OSB has been installed and properly nailed on exterior of house. Okay to proceed with stucco preparation. |