Permit: TC-RES-0326-01562
Permit Details
Status:
Inspections Complete
Type:
Residential Building - One or Two Family
Address:
7073 E STRIKE EAGLE WY
Address NEW:
7073 E STRIKE EAGLE WY
Apply Date:
03/30/2026
Applicant:
Delta Mechanical
Description:
Install TANKLESS INDOOR/OUTDOOR WH in garage
Permit Reviews
Permit Number - TC-RES-0326-01562
Permit Status: Inspections complete
Permit Description: Install TANKLESS INDOOR/OUTDOOR WH in garage
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 04/03/2026 | RESIDENTIAL ADD/ALT v.1 | 04/06/2026 | APPROVED |
Conditions
Permit Number - TC-RES-0326-01562
Permit Status: Inspections complete
Permit Description: Install TANKLESS INDOOR/OUTDOOR WH in garage
| Date | Description | Comments |
|---|---|---|
| 04/03/2026 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit is required prior to issuance of permit. The Affidavit form is available at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Permits/Residential-Permits. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. |
Outstanding Inspections
Permit Status: Inspections Complete
Permit Number: TC-RES-0326-01562
Permite Description: Install TANKLESS INDOOR/OUTDOOR WH in garage
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/17/2026 | COT - RSPL - Gas Pressure Test | N/A | Not Applicable |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-RES-0326-01562
Permit Description: Install TANKLESS INDOOR/OUTDOOR WH in garage
Total Completed Inspections - 1
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/07/2026 | RSBU - Building Final | Passed | Passed 5/7/26 |