Permit: TC-RES-0326-01553
Permit Details
Status:
Inspections
Type:
Residential Building - One or Two Family
Address:
1016 S RUBIO AV
Address NEW:
1016 S RUBIO AV
Apply Date:
03/30/2026
Applicant:
ER Ragel
Description:
REV1: moved propane tank & sub-panel Install inground 281 IA Spa. 98' Surface Area.
Permit Reviews
Permit Number - TC-RES-0326-01553
Permit Status: Inspections
Permit Description: REV1: moved propane tank & sub-panel
Install inground 281 IA Spa. 98' Surface Area.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 03/31/2026 | RESIDENTIAL POOL v.1 | 04/13/2026 | APPROVED |
| 09/08/2026 | RESIDENTIAL POOL REVISION v.1 | 09/15/2026 | APPROVED |
Conditions
Permit Number - TC-RES-0326-01553
Permit Status: Inspections
Permit Description: REV1: moved propane tank & sub-panel
Install inground 281 IA Spa. 98' Surface Area.
| Date | Description | Comments |
|---|---|---|
| 03/31/2026 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. |
Outstanding Inspections
Permit Status: Inspections
Permit Number: TC-RES-0326-01553
Permite Description: REV1: moved propane tank & sub-panel
Install inground 281 IA Spa. 98' Surface Area.
Total Outstanding Inspections - 3
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/24/2026 | Pool/Spa - Pre-Gunite | N/A | Re-inspection required | pool not properly grounded |
| 07/24/2026 | Pool/Spa - Electric | N/A | Re-inspection required | pool not properly grounded |
| 08/21/2026 | COT - RSEL - Electrical Final | N/A | Re-inspection required | 8-21-26: no power detected at exterior pool/spa receptacle. The receptacle itself must be a weather resistant GFCI. Upon reinspection, provide a set of approved plans. |
Completed Inspections
Permit Status: Inspections
Permit Number: TC-RES-0326-01553
Permit Description: REV1: moved propane tank & sub-panel
Install inground 281 IA Spa. 98' Surface Area.
Total Completed Inspections - 9
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/28/2026 | Pool/Spa - Pre-Gunite | Passed | ||
| 08/06/2026 | PDSD Building Division Pre-Construction Meeting | Passed | ||
| 08/06/2026 | Pool/Spa - Electric | Passed | ||
| 08/21/2026 | Pool/Spa - Bonding Grip | Passed | 8-21-26: bonding grip approved. | |
| 08/21/2026 | RSEL - Electrical Progress | Passed | 8-21-26: electrical progress approved. | |
| 08/21/2026 | Pool/Spa - Plumbing | Passed | 8-21-26: underground plumbing previously inspected & verified under test. | |
| 09/21/2026 | Pool/Spa - Final/Barrier | Passed | UL listed Pool cover in place. 9/21/2026 | |
| 09/21/2026 | RSBU - Building Final | Passed | ||
| 09/21/2026 | COT - RSEL - Electrical Final | Passed |