Permit: TC-RES-0326-01547
Permit Details
Status:
Complete
Type:
Residential Building - One or Two Family
Address:
507 N IROQUOIS AV UNIT 1
Address NEW:
507 N IROQUOIS AV UNIT 1
Apply Date:
03/29/2026
Applicant:
fernando palma
Description:
OVERHEAD ELECTRICAL UPGRADE TO 2-200 AMP, 120/240 VOLT, 1 PHASE ALL IN ONE METER BREAKER BOXES.
Permit Reviews
Permit Number - TC-RES-0326-01547
Permit Status: Complete
Permit Description: OVERHEAD ELECTRICAL UPGRADE TO 2-200 AMP, 120/240 VOLT, 1 PHASE ALL IN ONE METER BREAKER BOXES.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 04/13/2026 | ADMINISTRATIVE v.1 | 04/13/2026 | REQUIRES RESUBMIT |
| 03/31/2026 | RESIDENTIAL SIMPLE REVIEW v.1 | 04/01/2026 | REQUIRES RESUBMIT |
| 04/13/2026 | RESIDENTIAL SIMPLE REVIEW v.3 | 04/13/2026 | APPROVED |
| 04/08/2026 | RESIDENTIAL SIMPLE REVIEW v.2 | 04/08/2026 | REQUIRES RESUBMIT |
Conditions
Permit Number - TC-RES-0326-01547
Permit Status: Complete
Permit Description: OVERHEAD ELECTRICAL UPGRADE TO 2-200 AMP, 120/240 VOLT, 1 PHASE ALL IN ONE METER BREAKER BOXES.
| Date | Description | Comments |
|---|---|---|
| 03/31/2026 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit is required prior to issuance of permit. The Affidavit form is available at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Permits/Residential-Permits. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-RES-0326-01547
Permit Description: OVERHEAD ELECTRICAL UPGRADE TO 2-200 AMP, 120/240 VOLT, 1 PHASE ALL IN ONE METER BREAKER BOXES.
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/22/2026 | RSBU - Building Final | Passed | Passed 5/22/26 CLEARANCE INCR | |
| 05/22/2026 | COT - RSEL - Electrical Final | Passed | Passed 5/22/26 CLEARANCE INCR | |
| 05/22/2026 | BULD - Electrical Clearance | Passed | Passed 5/22/26 CLEARANCE INCR |