Permit: TC-RES-0326-01535
Permit Details
Status:
Complete
Type:
Residential Building - One or Two Family
Address:
805 W WEDWICK ST
Address NEW:
805 W WEDWICK ST
Apply Date:
03/27/2026
Applicant:
fernando palma
Description:
Replacement of a main 100 amp,120/240 volt, 1 phase electrical breaker panel.
Permit Reviews
Permit Number - TC-RES-0326-01535
Permit Status: Complete
Permit Description: Replacement of a main 100 amp,120/240 volt, 1 phase electrical breaker panel.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 03/27/2026 | RESIDENTIAL SIMPLE REVIEW v.1 | 03/27/2026 | REQUIRES RESUBMIT |
| 03/31/2026 | RESIDENTIAL SIMPLE REVIEW v.2 | 03/31/2026 | APPROVED |
Conditions
Permit Number - TC-RES-0326-01535
Permit Status: Complete
Permit Description: Replacement of a main 100 amp,120/240 volt, 1 phase electrical breaker panel.
| Date | Description | Comments |
|---|---|---|
| 03/27/2026 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit is required prior to issuance of permit. The Affidavit form is available at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Permits/Residential-Permits. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-RES-0326-01535
Permite Description: Replacement of a main 100 amp,120/240 volt, 1 phase electrical breaker panel.
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/02/2026 | COT - RSEL - Electrical Final | N/A | Not Ready | 04/2/2026 Not ready. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-RES-0326-01535
Permit Description: Replacement of a main 100 amp,120/240 volt, 1 phase electrical breaker panel.
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/02/2026 | BULD - Electrical Clearance | Passed | 04/02/2026 Approved clearance TEP INCR for 100A MPU at 9:45am. |
|
| 04/03/2026 | RSBU - Building Final | Passed | ||
| 04/03/2026 | COT - RSEL - Electrical Final | Passed | 04/03/2026 Approved, verified all branch circuits landed and labeled at dead front and SPD in place. |