Permit Details

Status:
Inspections
Type:
Residential Building - One or Two Family
Address NEW:
2519 N STEWART AV
Apply Date:
03/26/2026
Applicant:
Mike Mier
Description:
Upgrading 100 amp eletrical panel to a 200 amp

Permit Reviews

Permit Number - TC-RES-0326-01525
Permit Status: Inspections
Permit Description: Upgrading 100 amp eletrical panel to a 200 amp
Start Date Submittal Complete Date Status  
03/26/2026 RESIDENTIAL SIMPLE REVIEW v.1 03/27/2026 APPROVED Review Details

Conditions

Permit Number - TC-RES-0326-01525
Permit Status: Inspections
Permit Description: Upgrading 100 amp eletrical panel to a 200 amp
Date Description Comments
03/26/2026 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit is required prior to issuance of permit. The Affidavit form is available at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Permits/Residential-Permits. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.

Outstanding Inspections

Permit Status: Inspections
Permit Number: TC-RES-0326-01525
Permite Description: Upgrading 100 amp eletrical panel to a 200 amp
Total Outstanding Inspections - 2
Last Inspection Date Description Inspector Results Comments
04/08/2026 RSBU - Building Final N/A Not Ready Provide a set of plans and revise the current permit of new wiring to the home that is being completed prior to finals. At time of next inspection leave open walls to verify wiring throughout. An intermediate inspection is required. 4/8/2026
04/08/2026 COT - RSEL - Electrical Final N/A Not Ready Provide a set of plans and revise the current permit of new wiring to the home that is being completed prior to finals. At time of next inspection leave open walls to verify wiring throughout. An intermediate inspection is required. 4/8/2026

Completed Inspections

Permit Status: Inspections
Permit Number: TC-RES-0326-01525
Permit Description: Upgrading 100 amp eletrical panel to a 200 amp
Total Completed Inspections - 1
Date Description Inspector Results Comments
04/08/2026 BULD - Electrical Clearance Passed Clearance to TEP INCR. 4/8/2026

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD (SSRS).PDF DOCUMENTS VIEW
ALL PDF READER 20260326 14.39.15_V1.PDF DOCUMENTS VIEW