Permit: TC-RES-0326-01524
Permit Details
Status:
Complete
Type:
Residential Building - One or Two Family
Address:
2518 E HEDRICK DR
Address NEW:
2518 E HEDRICK DR
Apply Date:
03/26/2026
Applicant:
Jesus Morales
Description:
Relocating the meter panel from Unit 1 to new building Unit 2 located next to Unit 2 electrical panel to accommodate with TEP overhead service.
Permit Reviews
Permit Number - TC-RES-0326-01524
Permit Status: Complete
Permit Description: Relocating the meter panel from Unit 1 to new building Unit 2 located next to Unit 2 electrical panel to accommodate with TEP overhead service.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 03/26/2026 | RESIDENTIAL SIMPLE REVIEW v.1 | 03/27/2026 | APPROVED |
Conditions
Permit Number - TC-RES-0326-01524
Permit Status: Complete
Permit Description: Relocating the meter panel from Unit 1 to new building Unit 2 located next to Unit 2 electrical panel to accommodate with TEP overhead service.
| Date | Description | Comments |
|---|---|---|
| 03/26/2026 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit is required prior to issuance of permit. The Affidavit form is available at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Permits/Residential-Permits. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-RES-0326-01524
Permit Description: Relocating the meter panel from Unit 1 to new building Unit 2 located next to Unit 2 electrical panel to accommodate with TEP overhead service.
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/07/2026 | BULD - Electrical Clearance | Passed | for 2518 E Hendrick unit one and unit two | |
| 05/12/2026 | COT - RSEL - Electrical Final | Passed | 05/12/2026 Approved per plan, verified all circuits landed and labeled at dead front. |
|
| 05/12/2026 | RSBU - Building Final | Passed |