Permit: TC-RES-0326-01326
Permit Details
Status:
Complete
Type:
Residential Building - One or Two Family
Address:
2830 E MABEL ST
Address NEW:
2830 E MABEL ST
Apply Date:
03/16/2026
Applicant:
Manuel Valdez
Description:
Replace interior hot and cold lines LIKE FOR LIKE Horizontals-3/4" Copper type L Verticals-1/2" Copper type L Approx 250' LF
Permit Reviews
Permit Number - TC-RES-0326-01326
Permit Status: Complete
Permit Description: Replace interior hot and cold lines
LIKE FOR LIKE
Horizontals-3/4" Copper type L
Verticals-1/2" Copper type L
Approx 250' LF
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 03/16/2026 | RESIDENTIAL SIMPLE REVIEW v.1 | 03/17/2026 | APPROVED |
Conditions
Permit Number - TC-RES-0326-01326
Permit Status: Complete
Permit Description: Replace interior hot and cold lines
LIKE FOR LIKE
Horizontals-3/4" Copper type L
Verticals-1/2" Copper type L
Approx 250' LF
| Date | Description | Comments |
|---|---|---|
| 03/16/2026 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit is required prior to issuance of permit. The Affidavit form is available at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Permits/Residential-Permits. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-RES-0326-01326
Permit Description: Replace interior hot and cold lines
LIKE FOR LIKE
Horizontals-3/4" Copper type L
Verticals-1/2" Copper type L
Approx 250' LF
Total Completed Inspections - 2
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/19/2026 | COT - RSPL - Plumbing Final | Passed | 03/19/2029 Approved per plan. Verified all CU water line braced, insulated, and shutoff valve accessible at fixtures. |
|
| 03/19/2026 | RSBU - Building Final | Passed | 03/19/2029 Approved per plan. Verified all CU water line braced, insulated, and shutoff valve accessible at fixtures. |