Permit Details

Status:
Complete
Type:
Residential Building - One or Two Family
Address NEW:
402 N WESTMORELAND AV
Apply Date:
03/11/2026
Applicant:
Misael Leon
Description:
Upgrade existing residential electrical service to 200 amps. Replace existing electrical panel with new 200A main breaker load center. Reconnect existing branch circuits. Upgrade service entrance conductors as required. Verify existing meter socket is rated for 200A and reconnect to new panel. Install grounding and bonding system as required. Existing overhead service mast to remain unless replacement is required. All work to comply with NEC and local codes. Utility disconnect/reconnect will be coordinated with Tucson Electric Power (TEP).

Permit Reviews

Permit Number - TC-RES-0326-01230
Permit Status: Complete
Permit Description: Upgrade existing residential electrical service to 200 amps. Replace existing electrical panel with new 200A main breaker load center. Reconnect existing branch circuits. Upgrade service entrance conductors as required. Verify existing meter socket is rated for 200A and reconnect to new panel. Install grounding and bonding system as required. Existing overhead service mast to remain unless replacement is required. All work to comply with NEC and local codes. Utility disconnect/reconnect will be coordinated with Tucson Electric Power (TEP).
Start Date Submittal Complete Date Status  
03/11/2026 RESIDENTIAL SIMPLE REVIEW v.1 03/11/2026 REQUIRES RESUBMIT Review Details
03/13/2026 RESIDENTIAL SIMPLE REVIEW v.2 03/16/2026 APPROVED Review Details

Conditions

Permit Number - TC-RES-0326-01230
Permit Status: Complete
Permit Description: Upgrade existing residential electrical service to 200 amps. Replace existing electrical panel with new 200A main breaker load center. Reconnect existing branch circuits. Upgrade service entrance conductors as required. Verify existing meter socket is rated for 200A and reconnect to new panel. Install grounding and bonding system as required. Existing overhead service mast to remain unless replacement is required. All work to comply with NEC and local codes. Utility disconnect/reconnect will be coordinated with Tucson Electric Power (TEP).
Date Description Comments
03/11/2026 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit is required prior to issuance of permit. The Affidavit form is available at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Permits/Residential-Permits. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-RES-0326-01230
Permite Description: Upgrade existing residential electrical service to 200 amps. Replace existing electrical panel with new 200A main breaker load center. Reconnect existing branch circuits. Upgrade service entrance conductors as required. Verify existing meter socket is rated for 200A and reconnect to new panel. Install grounding and bonding system as required. Existing overhead service mast to remain unless replacement is required. All work to comply with NEC and local codes. Utility disconnect/reconnect will be coordinated with Tucson Electric Power (TEP).
Total Outstanding Inspections - 2
Last Inspection Date Description Inspector Results Comments
04/24/2026 RSBU - Building Final N/A Not Ready
04/24/2026 COT - RSEL - Electrical Final N/A Not Ready

Completed Inspections

Permit Status: Complete
Permit Number: TC-RES-0326-01230
Permit Description: Upgrade existing residential electrical service to 200 amps. Replace existing electrical panel with new 200A main breaker load center. Reconnect existing branch circuits. Upgrade service entrance conductors as required. Verify existing meter socket is rated for 200A and reconnect to new panel. Install grounding and bonding system as required. Existing overhead service mast to remain unless replacement is required. All work to comply with NEC and local codes. Utility disconnect/reconnect will be coordinated with Tucson Electric Power (TEP).
Total Completed Inspections - 3
Date Description Inspector Results Comments
04/22/2026 BULD - Electrical Clearance Passed 4.22.26
Approved for incr
05/08/2026 RSBU - Building Final Passed
05/08/2026 COT - RSEL - Electrical Final Passed

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD (SSRS).PDF DOCUMENTS VIEW
SITE_PLOT_PLAN_402_N_WESTMORELAND_TUCSON_V2.PDF DOCUMENTS VIEW
SURGE_PROTECTION_RESUBMITTAL_402_WESTMORELAND_V1.PDF DOCUMENTS VIEW