Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Residential Building - One or Two Family
Address:
9614 E ADARE LN
Address NEW:
9614 E ADARE LN
Apply Date:
03/09/2026
Applicant:
Ron Bayes
Description:
** NO WORK BEING DONE, SYSTEM TO REMAIN AS IS ** Electrical permit required to replace a pulled solar DG meter after repairs. This is in TEP's area, and a previous company had TEP pull the meter. The other repair company is gone, and we are re-initiating the process to achieve DG meter replacement.

Permit Reviews

Permit Number - TC-RES-0326-01209
Permit Status: Complete
Permit Description: ** NO WORK BEING DONE, SYSTEM TO REMAIN AS IS ** Electrical permit required to replace a pulled solar DG meter after repairs. This is in TEP's area, and a previous company had TEP pull the meter. The other repair company is gone, and we are re-initiating the process to achieve DG meter replacement.
Start Date Submittal Complete Date Status  
03/10/2026 RESIDENTIAL SIMPLE REVIEW v.1 03/10/2026 APPROVED Review Details

Conditions

Permit Number - TC-RES-0326-01209
Permit Status: Complete
Permit Description: ** NO WORK BEING DONE, SYSTEM TO REMAIN AS IS ** Electrical permit required to replace a pulled solar DG meter after repairs. This is in TEP's area, and a previous company had TEP pull the meter. The other repair company is gone, and we are re-initiating the process to achieve DG meter replacement.
Date Description Comments
03/10/2026 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit is required prior to issuance of permit. The Affidavit form is available at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Permits/Residential-Permits. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.

Completed Inspections

Permit Status: Complete
Permit Number: TC-RES-0326-01209
Permit Description: ** NO WORK BEING DONE, SYSTEM TO REMAIN AS IS ** Electrical permit required to replace a pulled solar DG meter after repairs. This is in TEP's area, and a previous company had TEP pull the meter. The other repair company is gone, and we are re-initiating the process to achieve DG meter replacement.
Total Completed Inspections - 2
Date Description Inspector Results Comments
03/26/2026 COT - RSEL - Electrical Final Passed 03/26/2026
Approved clearance TEP DGC. Reconnect DG meter to existing system repair.
03/26/2026 BULD - Electrical Clearance Passed 03/26/2026
Approved clearance TEP DGC. Reconnect DG meter to existing system repair.

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD (SSRS).PDF DOCUMENTS VIEW
ABBOTT, AARON_V0_03-05-2026_V1.PDF DOCUMENTS VIEW