Permit: TC-RES-0326-01084
Permit Details
Status:
Inspections
Type:
Residential Building - One or Two Family
Address:
9472 E CALLE CASCADA
Address NEW:
9472 E CALLE CASCADA
Apply Date:
03/03/2026
Applicant:
Description:
REV_1, Equipment Relocated; INSTALLATION OF 9.02kW PV SYSTEM; 22 - HANWHA QCELLS Q.PEAK DUO BLK ML-G10.C1+/AC (410W) MODULES INTEGRATED WITH Q.MI.349B-G1 MIRCO-INVERTERS (240V) (N) 01 - HANWHA QCELLS Q.HOME COMBINER 80 G1 [240V] (N) TESLA POWERWALL-3 (1707000-21-Y); 200A TESLA BACKUP SWITCH (1624171-XX-Y)
Permit Reviews
Permit Number - TC-RES-0326-01084
Permit Status: Inspections
Permit Description: REV_1, Equipment Relocated; INSTALLATION OF 9.02kW PV SYSTEM; 22 - HANWHA QCELLS Q.PEAK DUO BLK ML-G10.C1+/AC (410W) MODULES INTEGRATED WITH Q.MI.349B-G1 MIRCO-INVERTERS (240V) (N) 01 - HANWHA QCELLS Q.HOME COMBINER 80 G1 [240V] (N) TESLA POWERWALL-3 (1707000-21-Y); 200A TESLA BACKUP SWITCH (1624171-XX-Y)
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 03/04/2026 | RESIDENTIAL SOLAR v.1 | 03/19/2026 | APPROVED |
| 03/31/2026 | RESIDENTIAL SOLAR REVISION v.1 | 04/10/2026 | APPROVED |
Conditions
Permit Number - TC-RES-0326-01084
Permit Status: Inspections
Permit Description: REV_1, Equipment Relocated; INSTALLATION OF 9.02kW PV SYSTEM; 22 - HANWHA QCELLS Q.PEAK DUO BLK ML-G10.C1+/AC (410W) MODULES INTEGRATED WITH Q.MI.349B-G1 MIRCO-INVERTERS (240V) (N) 01 - HANWHA QCELLS Q.HOME COMBINER 80 G1 [240V] (N) TESLA POWERWALL-3 (1707000-21-Y); 200A TESLA BACKUP SWITCH (1624171-XX-Y)
| Date | Description | Comments |
|---|---|---|
| 03/04/2026 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. |
Completed Inspections
Permit Status: Inspections
Permit Number: TC-RES-0326-01084
Permit Description: REV_1, Equipment Relocated; INSTALLATION OF 9.02kW PV SYSTEM; 22 - HANWHA QCELLS Q.PEAK DUO BLK ML-G10.C1+/AC (410W) MODULES INTEGRATED WITH Q.MI.349B-G1 MIRCO-INVERTERS (240V) (N) 01 - HANWHA QCELLS Q.HOME COMBINER 80 G1 [240V] (N) TESLA POWERWALL-3 (1707000-21-Y); 200A TESLA BACKUP SWITCH (1624171-XX-Y)
Total Completed Inspections - 2
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/07/2026 | BULD - Electrical Clearance | Passed | 5/7/26 TEP CLEARANCE: DGC/BAT |
|
| 05/26/2026 | COT - RSOL - Electrical Final Solar Project | Passed | Passed by ODAIR |