Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

The login landing page when selecting 'View' is still occurring and is still pending further investigation. 

Permit Details

Status:
Complete
Type:
Residential Building - One or Two Family
Address:
6008 E 32ND ST
Address NEW:
6008 E 32ND ST
Apply Date:
03/02/2026
Applicant:
Antonia Lauterio
Description:
Upgrade electrical panel from 100 to 200 amp

Permit Reviews

Permit Number - TC-RES-0326-01048
Permit Status: Complete
Permit Description: Upgrade electrical panel from 100 to 200 amp
Start Date Submittal Complete Date Status  
03/10/2026 RESIDENTIAL SIMPLE REVIEW v.3 03/10/2026 APPROVED Review Details
03/02/2026 RESIDENTIAL SIMPLE REVIEW v.2 03/02/2026 REQUIRES RESUBMIT Review Details
03/02/2026 RESIDENTIAL SIMPLE REVIEW v.1 03/02/2026 REQUIRES RESUBMIT Review Details

Conditions

Permit Number - TC-RES-0326-01048
Permit Status: Complete
Permit Description: Upgrade electrical panel from 100 to 200 amp
Date Description Comments
03/02/2026 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit is required prior to issuance of permit. The Affidavit form is available at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Permits/Residential-Permits. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.

Completed Inspections

Permit Status: Complete
Permit Number: TC-RES-0326-01048
Permit Description: Upgrade electrical panel from 100 to 200 amp
Total Completed Inspections - 4
Date Description Inspector Results Comments
03/27/2026 BULD - Electrical Clearance Passed 03/27/2026
Approved clearance TEP INCR for 200A MPU at 1:35pm.
03/31/2026 RSEL - Electrical Progress Passed
03/31/2026 COT - RSEL - Electrical Underground Passed 03/31/2026
Verified schedule 40 underground conduit to riser at main panel.
03/31/2026 COT - RSEL - Electrical Final Passed 03/31/2026
Verified all branch circuits landed and labeled at dead front.

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD (SSRS).PDF DOCUMENTS VIEW
6008_V2.PDF DOCUMENTS VIEW
OWNER-BUILDER-AFFIDAVIT_073025_FILLABLE_V1.PDF DOCUMENTS VIEW