Permit: TC-RES-0325-01676
Permit Details
Status:
Complete
Type:
Residential Building - One or Two Family
Address:
3010 S PATRICK CI
Address NEW:
3010 S PATRICK CI
Apply Date:
03/31/2025
Applicant:
James Gibbs
Description:
1. Request Emergency Changeout as 60a breaker feeding bottom of panel is not working and cannot be removed 2. Install 200a main breaker load center 3. Same Location 4. Add gas/water bonding - grounding present
Permit Reviews
Permit Number - TC-RES-0325-01676
Permit Status: Complete
Permit Description: 1. Request Emergency Changeout as 60a breaker feeding bottom of panel is not working and cannot be removed
2. Install 200a main breaker load center
3. Same Location
4. Add gas/water bonding - grounding present
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 04/01/2025 | RESIDENTIAL SIMPLE REVIEW v.1 | 04/01/2025 | APPROVED |
Conditions
Permit Number - TC-RES-0325-01676
Permit Status: Complete
Permit Description: 1. Request Emergency Changeout as 60a breaker feeding bottom of panel is not working and cannot be removed
2. Install 200a main breaker load center
3. Same Location
4. Add gas/water bonding - grounding present
| Date | Description | Comments |
|---|---|---|
| 04/01/2025 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit is required prior to issuance of permit. The Affidavit form is available at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Permits/Residential-Permits. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-RES-0325-01676
Permit Description: 1. Request Emergency Changeout as 60a breaker feeding bottom of panel is not working and cannot be removed
2. Install 200a main breaker load center
3. Same Location
4. Add gas/water bonding - grounding present
Total Completed Inspections - 2
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/02/2025 | BULD - Electrical Clearance | Passed | 4/2/25: INCR TEP CLEARANCE | |
| 04/02/2025 | COT - RSEL - Electrical Final | Passed |