Permit: TC-RES-0325-01600
Permit Details
Status:
Complete
Type:
Residential Building - One or Two Family
Address:
2818 E FARR ST
Address NEW:
2818 E FARR ST
Apply Date:
03/27/2025
Applicant:
TFS Solar
Description:
roof mount 13.49kW DC photovoltaic solar system; 31 modules. (2) 7.6kW inverters, 2 branches each. 125A PV combiner box. Interconnection via 80A meter socket adapter with 80A integrated breaker to 200A bus with 200A MCB
Permit Reviews
Permit Number - TC-RES-0325-01600
Permit Status: Complete
Permit Description: roof mount 13.49kW DC photovoltaic solar system; 31 modules. (2) 7.6kW inverters, 2 branches each. 125A PV combiner box. Interconnection via 80A meter socket adapter with 80A integrated breaker to 200A bus with 200A MCB
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 03/27/2025 | RESIDENTIAL SOLAR v.1 | 05/23/2025 | REQUIRES RESUBMIT |
| 07/10/2025 | RESIDENTIAL SOLAR v.2 | 08/13/2025 | APPROVED |
Completed Inspections
Permit Status: Complete
Permit Number: TC-RES-0325-01600
Permit Description: roof mount 13.49kW DC photovoltaic solar system; 31 modules. (2) 7.6kW inverters, 2 branches each. 125A PV combiner box. Interconnection via 80A meter socket adapter with 80A integrated breaker to 200A bus with 200A MCB
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/27/2025 | BULD - Electrical Clearance | Passed | 8.27.25 Verbal clearance to TEP at 10:08AM for a collar adapter |
|
| 09/22/2025 | RSBU - Building Final | Passed | ||
| 09/22/2025 | COT - RSOL - Electrical Final Solar Project | Passed |